NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
NYC-WTC_000146129–000146748Folder label: “EPA OIG LAW”

OCR status: ocr · source: ours
NYC 9/11 Public Portal Document fe eo ivge, .* yee we Se - . es ¢ eee z s et ee ON a on A ee Reem hl cee ae rl ene mee a, eee we i Med SSanwdea me San eat at oot simocaen; Tene lees yy ofl _BERpEMy Bere. Asbestos Contro! Program 88-17 Junction Boulevard, 8” Floor, Corona, NY 11368-5107 ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) kL O YS fuse Building Dept. or TRU No FOR OFFICIAL USE ONLY (See fea schedule) this form at the NYC Department of Buildings, the original form and three (3) copies with original required. Submittal at the NYCDEP requires one copy of the form with original signatures. This submitted to the NYC DEP not less than one week in advance of the start of abatement activities . 1. FACILITY 2. Address Various Street Locations near 7 WTC(See Attached Sheet) Borough Manhattan Zip 10007 AKA 7 WTC Area 3. Block 4. Lot 5. Type of Facility.Steam, Gas & Transmission Pipe 6. Name of Building N/A ll, BUILDING OWNER 7. Name Con Edison Co. of New York, inc. 8. Contact Person Gregory Rucco Te es 10. Address 4 Irving Place City Manhattan state NY zip 10003 tt. GENERAL CONTRACTOR 11. Name_. Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name Felix Equities, inc. ___ 13, Contact Person Bill Carlock 14. Federal Employer ID. | #i- 15. Tel. iii” i] . id. suairems 7-2. 30x 650, Route 202 City Lincoindale State NY zip 10540 V. THIRD PARTY AIR MONITOR 17. Name ATC Associates, Inc. 48. Contact Person Robert Lewin 19. Federal Employer rc le 20. iii? a 22. Sample Analysis Laboratory ATC Associates 23. NYS DOH ELAP # 10879 VI. PROJECT INFORMATION 24. Starting date for this portion of work 4/3/02 Projected completion date 3/31/03 Asbestos work schedule [4] Monday ) Tuesday EZ] Wednesday [7 thursday 1] Friday ) saturday H] Sunday Shift from: 7 am CZ pm to? MamDO pm If other, specify | Access to inspect the premises must be provided during the work schedule indicated in this tem. _ 25. Total amount of asbestos-containing material to be abated during this work — 0 Square Feet, and/or___—15,245 Linear Feet NYC-WTC_000146413
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
21 shared non-person entities · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
19 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132519
A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
29 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
12 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099112
Invoice from Fiber Control, Inc. dated November 27, 2002, for exterior cleanup services at multiple sites including 113 Nassau Street.
8 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130799
Invoice from Benjamin Kurzban & Son Control, Inc. for roof work completed at 15 Dutch Street.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113167
Invoice from Fiber Control Inc. for cleaning services on the facade of 54 Warren Street.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119790
Invoice from Fiber Control Inc. for DEP environmental protection services at 14 Barclay Street.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122774
An invoice from Fiber Control Inc. dated August 2002 for facade services performed at 179 Broadway.
11 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121922
Invoice dated October 2002 for environmental remediation services performed on the exterior of 118 Chambers Street.
9 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000127588
Cover sheet or identification page for records associated with 94 Fulton Street from the DEP archive.
Similarity score 0.979 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111195
NYC DEP Asbestos Project Notification form submitted for abatement activities in Zone I.
Similarity score 0.979 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107427
Notice regarding exterior building surveys and debris removal at 120 Liberty Street following WTC collapse.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111304
NYC DEP Asbestos Project Notification form for an inspection report submission.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099841
Inspection record documenting an asbestos survey conducted at 55 Nassau Street with fields for inspector and contractor details.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100549
Itemized invoice from Asbestos Removal Corp. detailing costs for asphalt and gravel roof cleanup at 110 Liberty Street.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Cited alongside this record in an Ask answer
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000153382
Document arguing that respirator safety issues fall under OSHA jurisdiction and should be removed from the EPA review.
Cited alongside this record in an Ask answer
NYC-WTC_000138846
OSHA transmits NYS DOL data report containing sample summaries and worker information for WTC.
Cited alongside this record in an Ask answer