NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/No folder label
Document / 6 pages

Exterior Debris Survey Notice, 120 Liberty Street, May 2002

Machine-extracted title · confidence 90%

Notice regarding exterior building surveys and debris removal at 120 Liberty Street following WTC collapse.

NYC-WTC_000107427–000107432
Page image
Scanned page image, NYC-WTC_000107431
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document E 164W ONLY ТYРEИ FORI NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION C GT PUAmAIET Asbestos Control Program DEP 59-17 Junction Boulevard, 8° Floor, Corona, NY 11368-5107 TUI528MNO2 Building Dept. or TRU No FOR OFFICLAL USE ONLY HHAMIAL PROTECTON ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) 1 huebt (See fep schedule) www.nyc.Rov/dee When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities. I. FACILITY 2. Address 125 Cedar Street AKA 5. Type of Facility. II. BUILDING OWNER Borough Manhattanzip_11201 _ 3. Block _ 52 4. Lot _21 Residential _ 6. Name of Building - 7. Name 120 Liberty LeLuCe 9. Tel.#_ 718-830-0131 Fax# 97-77 Queens Blvd. 10. Address IlI. GENERAL CONTRACTOR 8. Contact Person Joe Messino _ City Flushing State _ NY _Zip- 11374 _Tel. #_ 11. Name. IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name _ Fiber Controle Inc. 14. Federal Employer ID. # Srzuie 3010 Burns Avenue _13. Contact Person _Peter Grande 15. Tel.#516-781-3000 _Fax#516-781-3085 City _ Wantagh NY 11793 State_ _Zp 16. Address _ V. THIRD PARTY AIR MONITOR 17. Name — A.T.C. Associates PI! 19. Federal Employer ID. # 104 East 25th Street 21. Address _ 22. Sample Analysis Laboratory__A. T.C. Associates _ 18. Contact Person Fred Burkhardt 20. Tel. # :212-353-8280 212-353-8306 _Fax#_ New YOIk - City _ State. NY _Zip 10010 _. 23. NYS DOH ELAP #_ 10879 VI. PROJECT INFORMATION 24. Starting date for this portion of work 9/12/0z Projected completion dare _10/5/02 Asbestos work schedule •& Monday [ Tuesday EWednesday [l Thursday Friday Saturday f Sunday Shift from: •pm to 1am 1pm If other, specify Access lo inspect the premises must be provided during the work schedule indicated in this item. LEL La Stp RECEIVED 19 2002 WOHS 25. Total amount of asbestos-containing material to be abated during this work 15,000 %l Square Feet, andor _ O Linear Feet :ACP 7 2/2001 NYC-WTC_000107431

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107431Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →