NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146429
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Ss we NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION - x es B Asbestos Control Program bur Xd © ¥ : i‘ D vy 59-17 Junction Boulevard, 8” Floor, Corona, NY 11368-5107 Bullding De TRU ONLY iN } ) FOR OFIGAL USE ONLY be ‘ ASBESTOS PROJECT NOTIFICATION po fs : a i (ASBESTOS INSPECTION REPORT) 4, $800 f we (See fee A this form at the NYC Department of Buildings, the original form and three (3) copies Wa ot El vA res are required. Submittal at the NYCDEP requires one copy of the form with original signatu must be submitted to the NYC DEP not less than one week in advance of the start of abatement S Vv 1. FACILITY A & 2. Address 86 TRINITY PLACE : Borough Manhattan Zip 10006 AKA AMERICAN STOCK EXCHANGE 3. Block 51 4.Lot 13 5. Type of Facility 6. Name of Bullding AMERICAN STOCK EXCHANGE ll. BUILDING OWNER 7. Name AMERICAN STOCK EXCHANGE LLC 8. Contact Person TOM SACHAREWITZ TD -... 10. Address 86 TRINITY PLACE City NEW YORK State NY___ Zip 10006 ill. GENERAL CONTRACTOR 11. Name Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name LVI ENVIRONMENTAL SERVICES INC. 43. Contact Person STEVEN STILES 14,Federal Employer +s. ro. AD. » Cy 40 Adaene- 489 GETTY AVENUE City CLIFTON State NJ Zip 07011 V. THIRD PARTY AIR MONITOR 17 Name ENVIRO SCIENCES 18. Contact Person GLENN NEUSCHWENDER 19. Federal Employer SA 20.7 CI Fax ay 21. Address 2150 SMITHTOWN ROAD City RONKONKOMA State NY Zip _11779 - 22. Sample Analysis Laboratory ENVIRO SCIENCES 23.NYSDOHELAP #11681 Vi. PROJECT INFORMATION 24. Starting date for this portion of work 2/23/02 Projected completion date 2/24/02 Asbestos work schedule [1] Monday | Tuesday oO Wednesday O Thursday oO Friday Saturday Sunday Shift from: 8:00 MlamCpm to 8:00 Olam Mpm if other, specify Access to inspect the premises must be provided during the work schedule indicated in this item. 25. Total amount of asbestos-containing material to be abated during this work 400 Square Fest, and/or______O Linear Feet NYC-WTC_000146429

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146429Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →