NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 40/63 WALL STREET; Bl. 27 Lot 9/1000828
Document / 10 pages

Invoice for roof asbestos removal, 63 Wall Street

Machine-extracted title · confidence 95%

Invoice detailing costs for asphalt and gravel roof cleanup operations at 63 Wall Street in June 2002.

NYC-WTC_000112570–000112579

Folder label: “63 WALL STREET; Bl. 27 Lot 9/1000828

Page image
Scanned page image, NYC-WTC_000112571
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document eer . NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION y O G cb ax aia Asbestos Control Program 4 Wa O , 59-17 Junction Boulevard, 8° Floor, Corona, NY 11368-5107 Bandng Dor aban ONLY ! FOR OFFICIAL USE ONLY TYP Mice ai ge’ ASBESTOS PROJECT NOTIFICATION a, | Se Stacray 90 ASBESTOS INSPECTION REPOR : XS ($ee fee schedule) When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original , signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities . |. FACILITY 2 Address ©3 Wall Street Boroughanhattan Zip 10005 AKA 3. Block 27 4. Lot 9 5. Type of Facility 6. Name of Building ll. BUILDING OWNER Brown Brothers Harriman 7. Name 8. Contact Person 9. Tel. # 212-493-8616 Fax # ° 10. Address City State Zip Ili. GENERAL CQNTRACTOR 14. Name Tel. # iV. ASBESTOS ABATEMENT CONTRACTOR 12. Name Trio Asbestos Removal Corp. Chris Horan 13. Contact Person f t iy ( 14, Federal Employer 1D. # Pil 45 tet ¢ 718-961-4100 Fox 718-961-4103 46, Address 14-20 129th Street city College Point State NY Zip 11356 _ V. THIRD PARTY AIR MONITOR 17. Name Warren & Panzer Engineers, P.C. 18. Contact Person Michael Nolan 19. Federal Employer ID. # 20. Tel, # 212-922-0077 Fax # 212-922-0630 21. Address 228 East 45th Street City New York StateNY Zip 10017 22. Sample Analysis Laboratory Warren & Panzer Engineers 93 yysponetapy 11251 VI. PROJECT INFORMATION 24. Starting date for this portion of work 6 | 27 ot Projected completion date j 3° ot Asbestos work schedule (] Monday O Tuesday Oj Wednesday a) Thursday O Friday C) Saturday | O Sunday Shift from: § an Com to g Olam Bom If other, specify Access (o inspect the premises must be provided during the work schedule indicated in this item. 25. Total amount of asbestos-containing material to be abated during this work L 5,000 Square Feet, and/or Linear Feet s NYC-WTC_0001 12571

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000112571Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →