NYC 9/11 Public Portal Document
ASBESTOS INSPECTION REPORT (continued)
26. Asbestos Hauler Lo O NYS DEC Permit # 0
-272--.3& 7
Disposal Site(s) OU I 2i2N li
27. This asbestos abatement is part of a (Item a through e requires filing of this form with NYC Department of Buildings)
a) ❑ Demolition b) ❑ Boiler Replacement c) ❑ Sprinkler Replacement d) ❑ Renovation/Alteration
e) 0 Fireproofing Replacement f) ❑ Other (Describe)
28. TYPE OF ABATEMENT (Check all appropriate boxes)
❑ Removal ❑ Enclosure ❑ Encapsulation ❑ Repair ❑ Clean up
29. ABATEMENT PROCEDURE (Check all appropriate boxes)
❑ Full Containment ❑ Glovebag ❑ Tent ❑ DEP Variance Application
30. LOCATIONS OF ABATEMENT
DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING
Floor(s) OF FLOOR CONTAINING ACM PERFORMED
(e.g. entire, east wing, room N. • (e.g. Pipe tagging, ceiling, plenum SQUARE LINEAR (e.g. running cable, installing fire sprinklers,
boiler room, lobby. etc) ducts, Storage tanks, decking. etc.) FEET FEET removing and replacing boilers. etc.)
Oo QN i t tee AS '- a1~$
31. I hereby declare that the information provided herein is true and complete to the best of my knowledge. I am familiar with Federal,
State and NYC laws and regulations applicable to asbestos related work.
s~~
Pint N r
4MM
itor
I 5 CY C
Frne f As slos contractor Pnnt Nam or App
~sr_
nt (If other than Owner)
ignaturo naturo Signature
~- s
Date Date Date
32. I understand that as the owner of a building where asbestos abatement activity occurs, I am responsible for the performance of
the asbestos abatement activities in accordance with the Asbestos Control Program Rules. I have contracted the third party air
monitor who is completely independent of all parties involved in the asbestos project. I hereby declare that I have authorized the
filing oft is notifi tion for the work specified herein.
— Print Name of Owner Signature Date
A STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.
An modification of information rovided on this formmustbereportedimmediately inwritingdirectly to the NYC DEP ACP.
The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened
through the performance of work in incremental or iecemeal fashion. A,CP7
v2001
NYC-WTC 000111393
OCR can misread numbers and units. Confirm readings against the page image before using them.