NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146427
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document EWRITTEN BLFORMS W RUC NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Program DEP 59-17 Junction Boulevard, 8* Floor, Corona, NY 11388-5107 TAIOSETANDS Suilding Dept or TRU N ASBESTOS PROJECT NOTIFICATION FOR OFFICIAL USE ONLI C.rov/deD (SBETOBNLMIERGENCY ER27/051200- When submittng this form at the NYC Department of Bulldings, the original form and three (3) coples with origina Submittal at the NYCDEP requires one copy of the form with original signatures. This foan must be submitted to the NYC DEP not less than one week in advance of the start of abatement activittes . FACUANE 2 Address 67 Liberty Street АКА _ Borough Manhattan - 3. Block 64 _ Zip _4. Lot_10 5. Type of Facility residential _6. Name of Building I. BUILDING OWNER 7. Name Promegranate Property Inc. 8. Contact Person Ron Shoshani 9. Tel. # Fax 10. Address 403 East 62nd Street City New York State NY _ZIp 10021 III. GENERAL CONTRACTOR 11.Name . Tel.# IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name Cashel Inc. _13. Contact Person Michael O°Connor 14. Federal Employer ID. - 15. Tel. 16. Address 3913 Provost Avenue City Bronx State _NY _ Zip_10466 .V. THIRD PARTY AIR MONITOR 17. Name Brasbestos Environmental Services, Inc. _18. Contact Person Edivane Franco 19. Federal Employer ID. — 20. Tel. 21. Address 970 East Main Street City Riverhead 22. Sample Analysis Laboratory ATC Associates Inc. State NY Zip_ 11901 _. 23. NYS DOH ELAP # 10879 VI. PROJECT INFORMATION 24. Starting date for this portion of work 3/2/02 Projected completion date 3/11/02 Asbestos work scheduleE Monday E Tuesday El Wednesday El Thursday El FridayE Saturday J Sunday E am Dpm to 5.30 _ Dam Epm !• Shift from: 8 Ifother, specify Access to inspect the premises must be provided during the work schedule indicated in this item. 25. Total amount of asbestos-containing material to be abated during this work 2,490 Square Feet, and/or • Linear Feet RECEIVED MAR 0 6 2002 TITE -=P!BANH! SSESTOSILEA PROGRAM TRUG ЛET ACP7 2/2001 NYC-WTC_000146427

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146427Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →