NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146149
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

World Trade Center Emergency Response Inspections conducted on December 15, 2002- Carlstien Lutchmedial

100 Church Street - At the building I met one of the workers who were on a lunch break. She said that at this time they were doing general cleaning. All ACM related work had been completed last week.

90 Trinity Place - the school is locked at this time. A construction crew was in front the building a partition on the sidewalk enclosing the entire school front. Is first scheduled to do the roof then the interior of the building.

100 Trinity Place - A TC was on site conducting various air contaminants sampling. Except for Asbestos fibers. This they said had been done last week and results were good. They said that three samples for lead were high in the cafeteria and room 207. As a result additional cleaning was being done. Air Sampling was being done outside the building for ACM by a DEP contractor.

125 Cedar Street/ - Met with Monte Cesta of Samson Management. He said that they tenants had accepted their sampling results and they additional sampling which was agreed along with DEP sometime ago was not being done. Presently, the apartments were being cleaned as a regular cleaning job.

250 South End Ave - I met the doorman who informed me that no work has been done on the courtyard. I asked him to call Joe Piastra, which he did. However, Piastra wasn't not in and a message was left for him to call DEP. Inspection of the courtyard revealed that it was in the same condition as when the sampling was done. It was observed that the courtyard was being used by construction workers to store old windows.

PS 234-Chambers & Greenwich St- Met Kwame Fosu of SCA. Kwame said the school was scheduled to be reopened on February 4th, 2002. All sampling for ACM was negative. The school appeared to be very clean. On the 3rd floor, plaster repair had been done to fix cracks on the walls. This had left lots of white dust in classrooms where the work had been done. Also present on site KISS construction. They were on site to clean up the dust. Kwamc said the plaster material was negative for ACM.

PS 89 Chambers & 'Westside Hwy - school is cleaned.

NYC-WTC_ 000146149

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146149Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →