NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146289
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document ¢e syofor NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION *.. Asbestos Control Program §9-17 Junction Boulevard, 8" Floor, Corona, NY 11368-5107 ony NYC wh) FOR GPPGAL USE ONLY TYR, : A s (ASBESTOS PROJECT NOTIFICATION | FOS Reig Oo” (ASBESTOS INSPECTION REPORT) 1. $1200 ae (See fee schedule) nn When submitting this form at the NYG Department of Buildings, the original form and three (3) copies with original if signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This {form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities . LL FACILITY nd 2. Address 15 Maiden Lane Borough Manhattan Zip _ 10038 AKA i 3.Block 65 a tot 7 5. Type of Facility Commercial 6. Name of Building il. BUILDING OWNER 7. Name Relied Realty Corp. 8. Contact Person Fran 9. Tel. # Fax # 10. Address 15 Maiden Lane City N.Y. State NY Zip 10038 Ul. GENERAL CONTRACTOR 11. Name Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR 12. — Stevenson Contracting Corp. 13. Contact Person Enos Stevenson 14. Federal Employer, 15. ro A a. oD 16. Address 37-38 13th Street City LIC. State NY Zip 11101 V. THIRD PARTY AIR MONITOR 17. Name Commercial Lab Enterprises 18. Contact Person Victor Escalona 21. Address_270 Swinton Avenue City Bronx state NY zip 10465 22. Sample Analysis Laboratory Commercial Lab Enterprises 23. NYS DOH ELAP # 11708 VL PROJECT INFORMATION 24. Starting date for this portion of work 9/28/01 Projected completion date 9/30/01 Asbestos work schedule [C] Monday O Tuesday oO Wednesday O Thursday Friday Saturday Sunday ay ee ts Fa N. : Shift from: 6:00 amL] pm to 2:00 [1am pm > If other, specify Access to inspect the premises must be provided during the work schedule indicated in this item. 4 RECEIVED 25. Total amount of asbestos-containing material to be abated during this work - 7,000 Square Feet, and/or 0 Linear Feet NYC-WTC_000146289

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146289Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →