NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146409
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document B1119 MS WILL EMERGENGYARTMENFOPE VRSMTAL PROTECION DEP Asbestos Control Program 59-17 Junction Bouløvard, 8* Floor, Corona, NY 11368-5101 TRUOSIQMNO Building Dept or TRU No FOR OFFICIAL USE ONLY ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) www.hy.y/dp 11,200- When pubrykting this form at the NYC Department of Bulldings, the original form and three (3) coples with original Subrnittal at the NYCDEP requires one copy of the form with original signatures. Thi Nmuet be submitted to the NYC DEP not less than one week in advance of the start of abatement activities . AdLm 2. Address 130 Liberty Street АКА 5. Type of Facility Commercial II. BUILDING OWNER 7. Name Cushman & Wakefield a/aff Deutsche Bank 9. Tel. Fax 10. Address 14 Wall Street Borough Manhattan _ 3. Block 54 _Zp_10006 _4. Lot 1 _ 6. Name of Building 8. Contact Person Marino Prodan _City New York _ State NY .Zp 10005 IIL. GENERAL CONTRACTOR 11. Name_ Tishman Construction IN. ASBESTOS ABATEMENT CONTRACTOR 12. Name. PAL Environmental Safety Corp. 14. Federal Employer ID 19. A.dd-cce. 43-09 Vernon Boulevard V. THIRD PARTY AIR MONITOR 17. Name Ambient Group, Inc. 19. Federal Employer ID 55 West 39th Street 21. Address. 22. Sample Analysis Laboratory Ambient Group, Inc. VI. PROJECT INFORMATION 24. Starting date for this portion of work 4/24/02 _ Tel.# -15. Tel. 13. Contact Person Paul Mast Fax Clty Long Island City State_NY Zip 11101 20. Tel 18. Contact Porson John Leitner Fax City New York State NY _Zp_ 10018 - 23. NYS DOH ELAP # 11732 Projected completion date 7/31/02 Asbestos work schedule D Monday Tuesday Wednesday Thursday Friday E am •pm to 12 El am pm • Saturday| Sunday Shift from: 8 If other, specify Access to inspect the promises must be provided during thework schedule indicated in this item. RELENED APR 16 2002 DEPSE ASB N 25. Total amount of asbestos-containing material to be abated during this work 102,000 Square Feet, and/or O Linear Feet RUG 17 1gl 21. NYC-WTC_000146409

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146409Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →