NYC 9/11 Public Portal Document
Mr. Pat Evangelista — Response to Comments
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701— August 11, 2005
34. Yes.
35. Sample rates are determined by the published sampling methodology utilized.
Modification was addressed in Comment #31 above.
36. Amended as noted.
37. Note added to ECAMP.
38. Sentence added.
39. Edited as noted.
40. Sentence added as noted.
41. Sentence added as noted.
42. Subsection edited as noted.
43. Re-written as noted
44. Footnote added as noted.
45. Footnote added as noted.
46. Footnote added as noted.
47. Table 3 does not apply to the demolition phase. A reference to Blanks has
been added to Table 1, which applies to both Phases
48. There will be two Thames Street monitoring stations. On is intended to be up
Thames Street down wind from the site, and on top of the Street bridge. The
other is intended to be at street level at the intersection of Greenwich Street. It
is our intent to be cooperative with EPA on exact locations.