at ground level and EPA requested that this station be moved further west to be located in
front of 21-23 Thames Street. Now Airtek is proposing to locate this station on the
sidewalk bridge. Based on the September 7, 2005 site walk, this third monitoring
location may be located on the sidewalk bridge through the Abatement Phase and for
only a portion of the Demolition Phase. Once the demolition of the 21-23 Thames Street
reaches the third level (i.e., parallel to the street bridge), the monitoring station located on
top of the sidewalk bridge will need to be brought down to street level in front of 21-23
Thames Street. EPA believes it would be beneficial for Airtek to relocate the street
bridge monitoring station during appropriate times when no work is being performed at
the buildings.
Agreed. Please see Section 3.2 paragraph 2.
Subsection 3.3 Abatement Work Air Monitoring
6. Need to add "Phase" after "Abatement" for the reference to Table 3 in the second
paragraph.
Done.
Table 1- Community Air Monitoring
7. Footnote 2: Remove the second "below" at the end of the footnote.
Done.
Table 1- Community Air Monitoring - Notes on Community Air Monitoring Table -
Dust
8. During the 4 Albany demolition, we found poor correlation between Met One 9012
results and the PM2.5 TEOM. The Met One E-BAM (with a heated inlet to address
condensible emissions) was found to correlate well with the TEOM and was utilized for
continuous PM2.5 monitoring in place of the Met One 9012. The Met One 9012 was used
for PMIo sampling only. We do not believe the Met One 9012 is appropriate for PM2.5
monitoring. The Met-One E-BAM, R&P TEOM, or Met-One BAM 1020 would be
acceptable alternatives. Revise this section and Table 1 to specify which of the three
aforementioned instruments will now be used.
The section states that the Met One E-BAM will be used. The BAM 1020 will be
usedfor data comparison. Table 1 and notes have been edited.
9. Since Airtek indicates in its response to EPA comment # 34 that the parameters
specified in Table 1 will be sampled during both the abatement and demolition phase, the
last two sentences of this paragraph need to be revised to indicate that the equipment will
be operated for at least one week before the Abatement Phase and that the results will be
-4-