submitted prior to the commencement of the Abatement Phase as opposed to the
demolition phase.
Corrected as noted.
Notes on Community Air Monitoring Table — Organic Compounds
(Dioxin/PCBs/PAHs)
10. Bullet item #1: Airtek may use the two weeks of organic background data collected
at 130 Liberty Street for its project as opposed to gathering it for the full week of its
background study.
Thank you.
11. Re-write the first sentence of bullet item #2 to state: "Organic samples will be
collected at each community monitoring location once a week on a different day of the
work week during the Abatement Phase and Demolition Phase, until all days of the work
week are used and then the same schedule will be repeated until project completion."
Edited as Noted.
Table 2- Data Reference Levelsfor Community Monitoring
12. The footnote added to Table 2 to the column titled "EPA Site Specific Trigger
Levels" and designated as note 2 incorrectly states, "A 4-hour value." Revise Note 2 to
state, "A 24-hour value".
Edited as Noted.
13. Note 3: Need to add "for chromium VI" after "USEPA Site Specific Trigger Level"
in the last line of note 3. Need to add "(0.6 ug/m3)" after chromium VI in the second to
last line of note 3.
Edited as noted.
Table 3 —Abatement Phase Work Area Monitoring
14. Airtek indicates in its response to EPA comment #47 that a reference to blanks has
been added to Table 1 which applies to both phases. No such reference has been
incorporated into Table 1. Revise the table to include the reference.
Please see reference to blanks in last row of Table 1.
-5-
NYC-WTC 000134346