NYC 9/11 Public Portal Document
D.. PROJECT DET. S
Provide all (nformatiwt requested below relating to specilies of asbcstus remowi.
I I. Project Dares: Starting date Completion date
If amended Starring date Completion date
Is this a phased project: D No l..l Yes flees. lilt scope. location, and starting aid completion dares for each phase in Section F. Remarks)
12. Do You Anticipate Doing: ❑ Night work ❑ Weekend work p✓ Shift work
(Provide derails in Section F.)
1 _. Dollar Amount orContract Between Parties Named in Item : and Item 7 5
W. If work is being coeducted under a variance, check appropriate box and supply variance number.
Applicable Variance No. 0 Individual Variance Petition No
15. Asbestos Dissemination Prevention Methods dire Section F. Remarks. and aaaeti additional sheets if necessary)
al Type of equipment & ventilation systems used
Equipment: Manufacturer. Model Number: Quantities:
HEPA Vacuums N/A N/A 2
Portable Decon Unit N/A N/A
Respirators Various N/A 8
Negative Air Unit Various N/A
Airtek Environmental Corp. — 0 5 8 9I
b) Name or air monitoring firm Asbestos Lic. No. 9 9
c) Laboratory performing the analysis
11040 / 10879
.Name Airtek I ATC Associates ELAP Registration No.
16. Type of Asbestos Work (check all that apply)
Pipe related E] Roofinalflashing ❑ CaulIdnghnasric ❑ Clean-up
Vessel covering 0 Siding .0 VAT ED Sprayed-on insulation
❑ Demolition - if site survey was previously submitted. provide Reference No.
Other osptcuit, VyTC Oust. •.virdow caulking and Cooing stone pinking
i]
17. Type and Amount of Asbestos-Containing Material Involved
Friable linear feet 57 Friable square fees 17,651
\on-friable linear feet + Non-(liable square feet + 671
Total linear feet — Total square feet = 18,322