NYC 9/11 Public Portal Document
SEP-12 05 21:21 FROM:DOL ACB 2123526902 10:718 PAGE:12
D. PROJECT .DETAILS
Provide all information regwi red below, 1dll,rg so spoc{Jfer gfarbestos r4o aL
It. Project Dates; Starting date Postponed Completion data Po8tporled
If amended: Starting date Completion data
is this a phased project: 0 No Q Yes (Ifyea, ltsr scope. looaiion, and staring and eomptet1on daresfor each phase in Section F, Remarkr)
12. Do You Anticipate Doing: ❑✓ Night work 0 Wcckend work 0 Shift work
(Provide details In Section R)
13. Dollar Amount of Contract Between Parties Named in Item 3 and Item 7 $
14. if work is being conducted under a variance, check appropriate box and supply variance number.
❑ Applicable Variance No. [3 Individual Variance Petition No.
15. Asbestos Dissemination Prevention Methods (ate Section F. Restark£ and attach addl*wol sheets IIfnecessmy)
a) Type of equipment & ventilation systems used
Equipment: Manufacturer: Model Number: Quantities:
HEPA Vacuums N/A N/A 2
Portable dawn Unit N/A N/A 1
Respirators Various N/A 8
Negative Air Unit Various N/A 1
Environmental Corp. f9 e — 0 5 s o
b) Name of air monitoring firm Alrtek Asbestos Lie. No.
c) Laboratory performing the analysis
Name Airtek I ATC Associates FLAP Registration No.
11040 / 10878
16. Type of Asbestos Work (check ail that apply)
0 Pipe related ❑✓ Roofing/flashing ❑ Caulking/mastic ❑ Clean-up
(] Vessel covering ® Siding Cl VAT ❑ Sprayed-on insulation
❑ Demolition - If site survey was previously submitted, provide Reference No.
El Other (pec{fy) YVit: [nrst and Tat
17. Type and Amount of Asbestos-Containing Materiel Involved
Friable linear feat Friable square feet 350,00Ô
Non-friable linear That + Non-friable square feet + 45
Total linear feet _____
Total square feet S
350,045
NYC-WTC 000134441
OCR can misread numbers and units. Confirm readings against the page image before using them.