NYC 9/11 Public Portal Document
::D PROJECT DET.4aS
Pnevide ch i fen ton requ d below relate to specOn ofasbesme removaL
11. Project Dates: Starting data Complenon date
If autended: Starting date Completion dare
Is this a phased project: No ®Yes (rust. Wxscopa location. wds gar4C4nnplodon Joistfor each phase In Section F. Reomrkc)
12. Do You Anticipate Doing: ❑ Night work ❑ Weekend work Q Shift work
(Provide defalLt in Section F.)
13. Dollar Amount of Contract Between Patties Named in Item 3 and Item 7 S
14. If work is being conducted under a variance, aback appropriate box end supply variance member.
❑ Applicable Variance No. ❑ individual Variance Pennon No.
15. Asbestos Dissemination Prevention Methods face Secdon F. Re-mrha andattach addiUoni siree&t fneasrsarv)
a) Type of equipment & ventilation systems used
Equipment Manufacturer: Model Number Quantities:
HEPA Vacuums N/A N/A 2
Portable Decon Unit N/A N/A I
Respirators Various N/A 8
Negative Air Unit Various N/A 1
Aktek Enyh nmental
b) Nano of air monitoring firm ~' Asbestos L ic. No. 9 8 — o 8 8 9
C) Iaboratoryperfatming the analysis
11040 / 10879
Name Airtek / ATC Associates ELApkegistrationNo.
16. Type of Asbestos Work (ekedrau that appavl
❑ Pipe related ❑✓ Rooting/flashing ❑ CauUdng/tnasdc 0 Clean-up
® Vessel covering ® Siding 0 VAT ❑ Sprayed-on insulation
❑ Demolition- if site survey was previously submitted. provide Reference No.
0 Other (spscttIl WTC Quat and Tar
17. Type and Amount of Asbestos-Containing Material Involved
Friable linear fat Friable square feet 42,378
Non-ftiable linear feast + Non-friable square feet + 4J
Total linear feet 1e Total square feet ® 42,423
NYC-WTC 000134198