NYC 9/11 Public Portal Document
[, PROJECT DETAILS
Provide ail inii nnuzion requested below relating :o specifics qiusbcsrov removal.
I i. Project Dates: Starting data Completion date
If amended: Starting date Completion date
Is this a phased project: Ej No F] Yes (Bees. list scope, location, and starting and completion daresfor each phase in Section F. Remarks)
1^-. Do You Anticipate Doing: ❑ Night work Weekend work ❑✓ Shift work
(Provide derails in Section F..)
13. Dollar Amount of Contract Between Parries Named in Item ) and Item 7 S
14. If work is being conducted under a variance, check appropriate box and supply variance number.
❑ Applicable Variance No. ❑ Individual Variance Petition No.
15. Asbestos Dissemination Prevention Methods (use Section F. Remarks, and attach additional sheers ijnecessarv)
a) Type of equipment & ventilation systems used
Equipment: Manufacturer: Model Number: Quantities:
HEPA Vacuums N/A N/A 2
Portable Decon Unit N/A N/A 1
Respirators Various N/A 8
Negative Air Unit Various N/A 1
Airtek Environmental Corp. 9 9 - 0 5 8 9
bl Name or air monitoring firm Asbestos Lie. No.
cl Laboratory performing the analysis
Associates 11040 / 10879
Name Airtek / ATC ELAP Registration No.
16. Type of Asbestos Work (check all that apply)
O Pipe related Roofmgifashing ❑ Caulking/mastic ❑ Clean-up
❑ Vessel covering ❑ Siding ❑ VAT Sprayed-on insulation
❑ Demolition , if site survey was previously submitted. provide Reference No.
0 Other (spec:t4J 'MC Dust and Tar
17. Type and Amount of Asbestos-Containine Material invoiced
Friable linear feet Friable square :beet 42.378
Non-friable linear feet + Non-friable square feet + 45
Total linear feet Total square feet = 42.423
=
NYC-WTC 000134910