ASBESTOS INSPECTION REPORT PAGE 1 OF 1 PREMISE ADDRESS 14 Wall Street / ' 2/30/02 SLOOP.. ZIP BORO CODE BLOCK LOT KOot, Facades 1 SQUAD 1 BADGE# A078 PHOTOS TAKEN Ya INSPECTORR. RAMMOHAN BLDG.. TYPE A BASISOF INSPEcnON TRU1790MN02 l n0 ASDesrosIRemoval Corp. SAMPLE NO.--------------------

t- 5 129 Street CollegePoint SAMPLE NO.--------------------

SAMPLE NO. 1f56 (Y j 61-4100 b ao e 'l a'izer Engineers P.C. -'ffl Wall Acquisitions ADDRESS TY 45 Street New 'ork ` all Street New~'ork STATE ldi3 STATE ZIP PHONE '17 (2 GFiQ( k2-0077

CONTACT PES ERSON I! Ravi Dindayal, Chief Engineer TIME OF INSPECTION FROM: 8 am _5 pm_

INSPECTION DISCLOSED: 10/26/02 : Jan Wolkovicz and Five handlers began setting up the decon on the roof and began cleaning various spots of the roof. Air monitoring was perfomed by Warren&Panzer. 10/27/02: The crew continued the cleaning in the roof and completed the roof at the end of the day. 11/30/02: Jan wolkovicz and six handlers came on site and setup scaffoldings on the 10th floor setback. Decon was setup at 10th floor for the exterior facade clean up.Two windows and ledges fo two facades facing east and west were completed. Oghogho performed air sampling. 12/01/02: Jan Wolkovicz and four handlers from Trio and Oghogho Erhaber of W&P on site. A large scaffolding was utilized to clean window s and ledges. At the end of the day that facade facing pine street was completed. 12/14/02: Jan Wolkovicz and six handlers and Festy Osemvegie of W&P were on site. Two scaffolds on Nassau Street were up on the facade for windows and ledges cleaning. Cleaning started from the 18th floor since cables were dropped from the vacant 19th floor. Debri observed only from 19th and down on ledges. Cleaning was done up to 8th floor at the end of the day. 12/15/02: The same crew came on site and continued cleaning and the cleaning was completed at the end of the day for that facade. 12/21/02: Jan Wolkovicz and six handlers and Festy Osemvegie were on site. Two scaffolds were ready for the facade of the pyramid building on wall street. Handlers began cleaning window and ledges from 18th floor and down. Cleaning was done up to 7th floor at the end of the day. 12/22/02: The same crew continued the cleaning on facade. At the end of the day facade cleaning was completed and the scaffolds were dismantled. Crew vacuumed the ledges of 19th floor on Wall and Nassau Street sides. 12/30/02: Jan Wolkovicz and four handlers came on site to clean the facade west of main entrance on Wall street from floors five and down where debris observed. A Genie manlift was utilized and the work was started at 6pm and completed at 12:30am. This completes the project in the entire building.

Project Completed.

NOV # INFRACTIONS RESULT CODE 5 NOV SUPERVISORS

ITVKV I =1V7A1`I I1P.I IAI`1 L=IiKVI A i=UKVV I%LYP #=%JUrrIN3 ,=a IAICIY IJLA[YV a BLDG. TYPE A> 6 STORIES B< 6 STORIES C SINGLE FAMILY D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY RESULT CODES I = Violation Issued 2 = No Violation Issued 3 = No access 4 = Project not Started (no NOV) 5 = Public Owned Property ACP3093

NYC-WTC 000112224

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000112224Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →