NYC-WTC_000114519
Invoice from Fiber Control Inc dated August 8, 2002 for exterior area cleanup at 94 Reade Street.
3 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗Letter notifying building owner of visible debris found during DEP and USEPA exterior surveys at 120 Liberty Street.
NYC-WTC_000108387–000108392Folder label: “22 John Street”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
ENVIRONMENTAL CONTROL BOARD NOTICE OF VIOLATION VIOLATION NO. 50035583M CITY OF NEW YORK AND HEARING YOU ARE REQUIRED, AND ARE HEREBY DIRECTED, TO APPEAR FOR A HEARING ON 1/2412.003 at 9:30 AM at the Environmental Control Board, 66 John Street, New York, NY 10038, 10th Floor.
This hearing is your opportunity to answer and defend the allegations set forth bolo IF YOU DO NOT APPEAR, YOU WILL BE HELD IN DEFAULT AND SUBJECT TO MAXIMUM PENALTIES. READ THE INSTRUCTIONS ATTACHED. Commissioner of the Department of Environmental Protection, Premise 22 JOHN STREET City of New York, Petitioner, V. Borough MANHATTAN
RELIDE REALTY COMPANY Respondent
15 MAIDEN LANE Street Address of Respondent
NEW YORK, NY 10038 City, State, Zip Cod
Capacity of Respondent: Contractor. Building Owner ® Other: ❑ ❑
Upon Investigation, Petitioner has determined that there is reasonable cause to believe that Respondent has violated the following subsections of
Title 24, Chapter 1, New York City Adminisbative Code (Air Pollution Control Code)
§ §:
Tide 15, Chapter 1, Rules of the City of New York Section 1-25(c) Failed to file Asbestos Inspection Report (Form ACP-7) with DEP one week In advance of the start of the work. ❑ Section 1-51(a) Employed uncertified workers ) on an asbestos project.
❑ Section 1-51(c) Failed to provide and/or ensure the wearing of protective clothing ( ) by all Individuals engaged in abatement activities. ❑ Section 1-51(g) Failed to post asbestos warning signs. ❑ Section 1-81(c) Failed to shut down electric power to the work area. ❑ Section 1-81(i) Failed to seal fixed objects with at least one layer bong plastic sheeting. ❑ Section 1-81(m) Failed to seal floor and wall surfaces with at least two layers 6-mt plastic sheeting. 0 Section 1-82(a) Failed to provide a worker decontamination system. ❑ Section 1-83(a) Failed to provide a waste decontamination system. ❑ Section 1-91(a) Failed to utilize negative pressure equipment ❑ Section 1-92(a) 2 Failed to maintain an entry / exit log. ❑ Section 1-102(a) Failed to abate ACM by wet methods. 0 Section 1-102(d) Failed to bag ACTT directly upon detachment from the substrate. ❑ Section 1-102(f) Failed to remove all visible residue from surfaces from which ACM has been removed. ❑ Section 1-112(f) Failed to verify the absence of visible ACM prior to commencement of clearance air monitoring.
Other:
(1) 1-36(a) Failed to contract a third party air monitor.
(2)
(3)
(4)
SECOND OFFENSE (LIST SUBSECTIONS):
The above violation occurred or was observed or was determined to exist based on a review of departmental records, on or about Tuesday, September 17, 2002 at: 8:30 PM .4020 inspector's Signature/Badge Number
If such violation be proven or admitted, Respondent may be subject to civil penalties for each subsection of the violation in amounts according to the schedule set forth on the reverse side of this form for each day during which such violation continues.
lIIIIllhIIIfIIIIIUII1t1IVfflll Wl651
NYC-WTC 000108387
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000114519
Invoice from Fiber Control Inc dated August 8, 2002 for exterior area cleanup at 94 Reade Street.
3 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112009
DEP letter instructing owners to assess and clean up visible WTC debris on the roof of 12 Vesey Street.
4 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117327
Billing document from a contractor for cleaning 4,500 square feet of gravel roof at the specified location.
2 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122622
Invoice from Fiber Control Inc. dated August 28, 2002 for services at job sites listed.
2 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122640
Form documenting facade and roof debris inspection results for 175 Broadway following WTC collapse.
4 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122590
Official DEP asbestos inspection report for 173 Broadway detailing facility address and inspection dates in June 2002.
3 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100648
Final notice regarding WTC debris found on exterior surfaces and invitation to participate in City cleanup program.
3 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119534
Invoice from Kurzban & Son Control Inc. for roof asbestos removal work completed at 49 Ann Street.
4 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127238
Invoice from Fiber Control Inc. dated July 18, 2002, detailing charges for facade cleaning services at 143 Chambers Street.
3 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126911
Blank DEP form for recording asbestos inspection details including inspector information and building characteristics.
4 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000108386
Data sheet containing asbestos analysis results for samples collected at the World Trade Center site.
Filed in the same folder
NYC-WTC_000114519
Invoice from Fiber Control Inc dated August 8, 2002 for exterior area cleanup at 94 Reade Street.
Similar indexed content
NYC-WTC_000112009
DEP letter instructing owners to assess and clean up visible WTC debris on the roof of 12 Vesey Street.
Similar indexed content
Billing document from a contractor for cleaning 4,500 square feet of gravel roof at the specified location.
Similar indexed content
Invoice from Fiber Control Inc. dated August 28, 2002 for services at job sites listed.
Similar indexed content