NYC-WTC_000112731
A blank or partially filled asbestos inspection report form for a site identified as 22 Warren Street.
3 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
ASBESTOS INSPECTION REPORT PAGE 1 OF I {P RO111~SI: ADDRESS 60 William Street Aka 48 Pine Street (Our Lady of Victory) ~~ ZIP BORO CODE BLACK TAT KOOIS, Facade 1 SQUAD 1 BADGES A078
'1HUTOS TAKEN INsI'lCIORR. RAMMOH AN DLDc.. TYPE B BASISOFINSPLCIION TRU
`l no Xsoes tos `Removal Corp. SAMPLE NO.
'1t4---LU, 129 Street CollegePoint SAMPLE NO.
( jE96141Ø0 W l J 56 SAMPLE NO.
Y)RAIO ML NE SN MEi warren anzer Engineers P.C. our a ty of Victory ~If%st 45 Street New'Vork M PWilliam Street New York NV` 16617 (2 22-0O77 MYF 10%5 (21' *22-5535 ( ON -IA( -r PLRSON Pastor Joseph Lucas nnMI:OF INSPEITION FROM 8am 8pm & 8am - 12mid
INSPECTION DISCLOSED: 9/20/02 (Friday) : Steven Parmagiani, Project Manager, Miguel Rodriguez ,Cert#89050, Handler Supervisor + 5 Handlers, Idris Idowu, Project Monitor. The crew started mobilizing at 8am to the bulkhead roof to clean the gravel with massive debris. The roof surfaces were never cleaned. Work completed at 8pm after bagging all the gravel and 60 bags of waste was generated. The parapit walls at all four sides were also washed. 9/21/02 (Saturday): Steven Parmagiani, Miguel Rodriguez and fi ve handlers. Two handlers on the roof washing the bulkhead facade of east and south side using safety lines. The rest of the three handlers were setting-up the plastic and dyke on the sidewalk on william street to prepare for facade washing. Due to the street closure and acivities on water street and all the cross streets from Fulton to Broad Streets for NBA Hoop Weekend (the boom truck had to travel through Bowling Green to Trinity Place to Liberty Street to William Street) the boom made to the site at 12noon only and washing began. Washing of bulkhead facades completed and two handlers began cleaning the roof gutters. The facade washing complted at 7pm on william street and the windows needed to cleaned. The crew left the site. 9/22/02 ( Sunday): Miguel Rodriguez, Sal Dipoala, Supervisors and six handlers. Three handlers at each side (east and west) began washing and cleaning the PH2 level facade and windows. Due to the mass scheduled for the day Pine street facade washing to start after 1:30pm. Crew began prepping the sidewalk. The boomtruck would not lift and the supervisor consults with project manager. I observed that the safety pins on the equipment was not removed and the four wheels were not extended maximum to outward. I ask the supervisor operator to perform these tasks and the equipment was ready for use. The washing began at 4pm on Pine street facade. The facade was completed at 7pm and a visual inspection was not satisfactory and recleaning was started. The PH2 facade cleaning was also not satisfactory and areas requiring additional cleaning were pointed to the supervisor. Additonal cleaning completed at 9pm. The windows cleaning on william street began. All the cleaning were completed at IOpm and crew began to unload the supplies and equipment from PH2 level setback to the street and left the site at 11:15pm.
Project completed.
NOV v INFRAC'nONS RESULT CODE 5 NOV k SUPERVISORS rNmAts
BLDG. TYPE A >6 STORIES 8<6 STORIES C SINGLE FAMILY D SCHOOL E HOSPI'T'AL F PUBLIC OWNED PROPERTY RESULT CODES 1 = Violation Issued 2 = No Violation Issued 3 = No access 4 = Project not Started (no NOV) 5 - Public Owned Property ACP3093
NYC-WTC 000110279
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000112731
A blank or partially filled asbestos inspection report form for a site identified as 22 Warren Street.
3 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128520
Form for recording facade inspection results regarding WTC debris at 94 1/2 Greenwich Street.
4 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122616
Inspection form recording facade and roof conditions at 174 Broadway regarding asbestos and WTC debris presence.
3 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123578
Application form for asbestos abatement work at 29 Broadway including contractor and air monitor details.
4 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123041
Final notice from the Department of Environmental Protection to the owner of 187 Broadway regarding debris cleanup participation.
3 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118968
Inspection form documenting facade conditions and asbestos monitoring status for a building at 65 Beaver Street.
3 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134005
Visual survey form recording inspection results for the facade of a building at 133 Greenwich Street.
4 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128634
Inspection report documenting debris and asbestos conditions on the first floor of 106 Greenwich Street during a September 2002 survey.
3 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123643
Form documenting building inspection findings including facade assessment and ACM presence for a property in the WTC area.
3 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113740
NYC DEP asbestos inspection report form for a facility at 130 Water Street with start and completion dates in July 2002.
4 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100648
Final notice regarding WTC debris found on exterior surfaces and invitation to participate in City cleanup program.
3 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Filed in the same folder
Filed in the same folder
Filed in the same folder
Filed in the same folder
Filed in the same folder