ASBESTOS INSPECTION REPORT PAGE 1 OF 1
PREMISE ADDRESS 300 Albany Street ~ DA—T12/13/02
FLAW ZIP BORO CODE BLOCK LOT
1W 1 SQUAD 1 BADGE# A078
PHOTOS TAKEN Yes
INSPECTOR R. RAMMOHAN BLDG.. TYPE A BASIS OF INSPECTION TRU191OMNO2
NM SIOS iCeMoVal Corp. SAMPL8NO.------------------
MW, 129 Street CollegePOmt SAMPLENO:___--_-_---__-
SAMPLENO.
1 f 56 (''Y 61-4100
OWNERS NAME
WM'&W zer Engineers P.C.
yPork ADDRESS CITY
st ~45 Street Ne Q
wL.I
?A p STATE EP PHONE
.WE 10U'17 c222-0077
CONTACT PERSON Don, Building Manager TIME OF INSPECTION FROM:
am —5 pm
8
INSPECTION DISCLOSED:
Saturday 11/23/02: Ireneusz Womoczyl,89339 and 6 handlers of Trio and Edman Dibra, AH 01-12337 of
Warren&Panzer arrived on site. A decontamination unit was erected at elevator mechanical room at the roof level
and handlers began washing the gravel from the west side.
Sunday 11/24/02: No work scheduled due to building management's policy of no roof work on Sundays.
Monday 11/25/02:Ireneusz and 6 handlers & John H. Boyd, AH 90-05530 of Warren&Panzer were on site and roof
gravel washing continues.
Tuesday 11/26/02: Ireneusz Womoczyl and 7 handlers & Idris Idowu, AH 02-11201 of Warren&Panzer were on
site. Gravel washing on roof continues.
Wednesday 11/27/02: Ireneusz & 7 handlers and John Burgees, AH 97-11398 of W&P on site. Roof gravel
washing continues.
Thursday 11/28102: Thanksgiving Day- No work scheduled.
Friday 11/29/02: Ireneusz & 6 handlers and John Boyd of W&P on site. It was a very cold day. Visual inspection
revealed that several spots of gravel requires re-cleaning. Gravel was settled and frozen and was difficult to showel.
Despite the cold washing continued.
Saturday 11/30/02: No work was scheduled due to drop in temperature.
Sunday 12/01/02: Ireneusz & 8 handlers of Trio and Edman Dibra of W&P were on site. Gravel washing continued
at south east section of the roof.
Monday 12/02/02: Ireneusz & 6 handlers of Trio and John Burgees of W&P were on site. Gravel washing of
several spots previously identified for re-washing completed and waste bags were transported to the courtyard. The
area where waste bags were stored needed cleaning and will be done tomorrow. Waste bags were loaded in to ATC
waste hauling truck.
Tuesday 12/03/02: Ireneusz & 6 handlers of Trio and Dipo Elemo, AH 01-14694 of W&P were on site. Gravel
washing of a spot was done on roof and a decontamination unit was erected at the courtyard for soil remval. The
courtyard perimeter fence railings were plasticized. Removal of soil at court yard began by removing 2" of soil. It
was a very cold day and the ground was frozen as the day progresses. 90% of the cortyard soil removal completed
and south east corner and between paving blocks ice was formed and the work was stopped for another day.
Friday 12/13/02: Ireneusz & 6 handlers of Trio and Festy of W&P were on site for the remainder of soil removal at
the courtyard. Soil removal and cleaning between the paving blocks completed at the end of the day. Waste bags
were transported by the ATC truck.
Project Complted.
RESULT CODE
NOV # INFRACTIONS
5
SUPERVISORS INTrIAIS
NOV#
I — xvuulq I IILLN L DAVl\sl J— 1 —{[vuua.v .'—uasaaua•avu
BLDG. TYPE A>6 STORIES B< 6 STORIES C SINGLE FAMILY
D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY
RESULT CODES 1= Violation Issued 2 = No Violation Issued 3 = No access
4 = Project not Started (no NOV) 5 = Public Owned Property ACP3093
NYC-WTC 000116391