ASBESTOS INSPECTION REPORT PAGE 1 OF I
PREMISE
ADDRESS 60 William Street Aka 48 Pine Street (Our Lady of Victory) §V1 TI-` /`rIr~02
~{ O ZIP BORO CODE BLOCK LOT
:s, Facade
two .- SQUAD I BADGE► A078
PHOTOS IAKEN
INSPECTOR R. R AMMOHAN BLDG.. TYPE B BASIS OF INSPECTION TRU
[ A
1A p
ASD6SL0S kemoval Corp. SAMPLE NO.
129 Street "olleVL olnt SAMPLE NO.
SAMPLE NO.
!V T I 1 J56 (/ py
1 '9 61-4100
a zer Engineers P.C. iT'Lt , }~~f Victory
2 `last 45 Street Ne'ork t liam Street New Fork
MY' 107 (2Y5 22-0077 ? 10Ub5 (2 f 2 N422-5535
CONTACT PERSON Pastor Joseph Lucas TIME OF INSPECTION FROM: Sam — 8pm & 8am — l2mld
INSPECTION DISCLOSED:
9/20/02 (Friday) : Steven Parmagiani, Project Manager, Miguel Rodriguez ,Cert#89050, Handler Supervisor +5
Handlers, ldris Idowu, Project Monitor. The crew started mobilizing at 8am to the bulkhead roof to clean the gravel
with massive debris. The roof surfaces were never cleaned. Work completed at 8pm after bagging all the gravel and
60 bags of waste was generated. The parapit walls at all four sides were also washed.
9/21/02 (Saturday): Steven Parmagiani, Miguel Rodriguez and five handlers. Two handlers on th cjroof washing
the bulkhead facade of east and south side using safety lines. The rest of the three handlers were sen -up the
plastic and dyke on the sidewalk on william street to prepare for facade washing. Due to the street cloire and
acivities on water street and all the cross streets from Fulton to Broad Streets for NBA Hoop Weekend (the boom
truck had to travel through Bowling Green to Trinity Place to Liberty Street to William Street) the boom made to
the site at 12noon only and washing began. Washing of bulkhead facades completed and two handlers began
cleaning the roof gutters. The facade washing complied at 7pm on william street and the windows needed to
cleaned. The crew left the site.
9/22/02 ( Sunday): Miguel Rodriguez, Sal Dipoala, Supervisors and six handlers. Three handlers at each side (east
and west) began washing and cleaning the PH2 level facade and windows. Due to the mass scheduled for the day
Pine street facade washing to start after 1:30pm. Crew began prepping the sidewalk. The boomtruck would not lift
and the supervisor consults with project manager. I observed that the safety pins on the equipment was not removed
and the four wheels were not extended maximum to outward. I ask the supervisor operator to perform these tasks
and the equipment was ready for use. The washing began at 4pm on Pine street facade. The facade was completed
at 7pm and a visual inspection was not satisfactory and recleaning was started. The PH2 facade cleaning was also
not satisfactory and areas requiring additional cleaning were pointed to the supervisor. Additonal cleaning
completed at 9pm. The windows cleaning on william street began. All the cleaning were completed at 10pm and
crew began to unload the supplies and equipment from PH2 level setback to the street and left the site at 1 1:15pm.
Project completed.
NOV M INFRACTIONS RESULT CODE
5
NOV* SUPERVISORS INrnAL.S
1LPP
DVAV I - lYlil\IlA I I Ai\ L- DRVI\A .1 DAVVAL 11 9-\(VI.I:i\. .IN1 Gl\IJLAIL
BLDG. TYPE A >6 STORIES B< 6 STORIES C SINGLE FA11ILY
D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY
RESULT CODES I - Violation Issued 2 = No Violation Issued 3 = No access
4 - Project not Started (no NOV) 5 - Public Owned Property ACP3093
NYC-WTC 000110262