NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 34/49 MURRAY ST 1001437, 133/7503
Document / 1 page

WTC debris inspection form for residential building, 2002

Machine-extracted title · confidence 85%

Inspection record documenting facade assessments and air monitoring results for a residential building near the WTC site.

NYC-WTC_000100368

Folder label: “49 MURRAY ST 1001437, 133/7503

Page image
Scanned page image, NYC-WTC_000100368
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 1950 0 NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection:. ASBESTOS INSPECTION REPORT TRU0920MN02 ONLYTYPEWRRTEN FEE EXEMPT: Yes APPS NS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMRTED 1. $0.00 A

START DATE: L TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE OF START OF THE WORK (ABATEMENT ACTIVITIES) 6/21/02 PROJ. COMPLETION DATE: 6/29/02 ;•' Variance

L FACILITY ADDRESS: 49 MURRAY ST. BORO: MANHATTAN ZIP: 10007 TYPE OFFACILITY: ---- -- BLOCK: ---- LOT: --- IL BUILDING OWNER NAME: 49 MURRAY HOUSES CONDOMINIUM Contact ------------- TEL. #: ADDRESS: 49 MURRAY ST. CITY: NY STATE: NY ZIP: IV. ASBESTOS ABATEMENT CONTRACTOR NAME. FIBER CONTROL INC. TEL. N: (516) 781-3000 FEDERAL EMPLOYER IDENTIFICATION # ? P11 ADDRESS: 3010 BURNS AVE CITY. WANTAGH STATE: NY ZIP: 11793 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: SCIENTIFIC LABORATORIES INC - NEW YORK CI NYS ELAP #: 11480 ASBESTOS WORK SCHEDULE V. DAY W EVENING ❑ NIGHT ❑ WEEKENDS ❑ WEEKDAYS INSPECTOR NAME: P j SQUAD #: .L — — BADGE #: ~a DATE OF INSPECTION: 7/I 3 AQ T9EF INSPECTION: From: ~ AM PM To: 4. i7Q AM f j PM L Contact at site: —

I inspection disclosed that the following sections were complied with: (Check all that apply) 1.51- Notifications, Reports, Pia U 1-71 - Air Sampling and -Monitorin LI 1 ~ 1-91 - Worker Protection 1.101 - Materials and Equipment 1.116 - Work Place Preparation 1.117 - Worker Decontamination System

L I_ 1-118. Waste Decontamination System 1-126. Engineering Controls C! 1.127_ Entry/Exit Procedures —1 1-129- Maintenance of Barriers LI] 1.138 - Encapsulation Li 1-139 -Enclosure 1-140- Giovebag LJ 1.141 -Tent 1.137 - ACM Disturbance, RemoveL, Handling 1-14.6. Preliminary Clean-up ! J 1-147 - Final Clean-up

L._._. Project not started - - -_ ----- Inspection revealed all ACM to be intact. New start date: L Project ongoing, expected completion date:

ii Project completed on or about / / . All surfaces, including abated surfaces ire free of visible ACM and ePcapsulat

L follow up necessary on Samples taken: I] j No Yes 1 2 3 4 5 6 Photos taken: Yes l j No -- ~,= _ — L Additional comments:— m —— — — ~

RESULT CDDE BORO 1 =MANHATTAN 2 =BRONX 3 = BRDOOKLYN 4 =QUEENS 5 =STATEN ISLAND RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVI50 I s 4 =PROJECT NdT STARTED (NO NOV) 5= -PROJECT COMPLETED (NO NOV) (-- —

NYC-WTC 000100368

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100368Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →