Machine-extracted titleNYC-WTC_000173165
Credit change order from Ambassador Construction for fiber distribution and audio system work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.392
Machine-extracted titleNYC-WTC_000171347
Proposal for engineering services related to Department of Transportation camera installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.392
Machine-extracted titleNYC-WTC_000168650
Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.389
Machine-extracted titleNYC-WTC_000171280
Contractor proposal from Ambassador Construction dated November 16, 2000 to install a lock-out switch for $1,221 at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.389
Machine-extracted titleNYC-WTC_000171405
Memorandum submitting change order #60 to close a gap in the hurricane wall with steel plate at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.387
Machine-extracted titleNYC-WTC_000168378
Contractor submission for Change Order #98 to convert press room lights and install louvered fixtures.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.387
Machine-extracted titleNYC-WTC_000171444
Ambassador Construction letter dated January 29, 1999, submitting Change Order #63 for $1,912 to install a pipe sleeve and cable at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.384
Machine-extracted titleNYC-WTC_000168664
Revised change order submitted to modify wood door jambs and replace specific doors at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.382
Machine-extracted titleNYC-WTC_000173451
Letter from Ambassador Construction submitting Change Order #003 for electrical work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.379
Machine-extracted titleNYC-WTC_000172193
Contractor submission of revised change order for removing floor granite at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.379
Machine-extracted titleNYC-WTC_000171482
Cost proposal submitted by Ambassador Construction Company to install a new lock-out switch for the Inergen system at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.377
Machine-extracted titleNYC-WTC_000171552
Contractor letter submitting revised Change Order #096 for $10,225 to install heat tracing on the 7th floor generator room.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.377
Machine-extracted titleNYC-WTC_000173994
Submission of Change Order #53 for $2,898 covering additional electrician work at the site.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.376
Machine-extracted titleNYC-WTC_000172223
Letter from Ambassador Construction submitting Change Order #072 for pantry equipment at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.376
Machine-extracted titleNYC-WTC_000171920
Quotation for structural steel supports and fireproofing required to mount microwave dishes on the World Trade Center roof in November 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.375
Machine-extracted titleNYC-WTC_000168370
Contractor submission for Change Order #103 covering audiovisual work on the 1st, 7th, and 23rd floors.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.375
Machine-extracted titleNYC-WTC_000173307
Letter from Ambassador Construction submitting a proposal to install a special class I package receiver at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.370
Machine-extracted titleNYC-WTC_000171293
City memo approving $3k for installing self-closing hatch mechanism in tank room fire system.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.369
Machine-extracted titleNYC-WTC_000173302
Contractor submission for change order #008 to install bullet-resistant doors and walls at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.368
Machine-extracted titleNYC-WTC_000171897
Ambassador Construction submits Change Order #016R for electrical work at the Mayor's Office of Emergency Management on November 13, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.367
Machine-extracted titleNYC-WTC_000168493
Memo submitting Change Order #66 for $15,460 to install floor boxes and relocate wiring at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.365
Machine-extracted titleNYC-WTC_000171299
Contractor submission of change order #110 to install a sprinkler head and door astragal at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.363
Machine-extracted titleNYC-WTC_000168385
Letter submitting change order #97 for enclosing fuel oil lines with sheetrock assembly at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.361
Machine-extracted titleNYC-WTC_000168544
Memo submitting Change Order #51 for adjusting shelving heights in storage rooms at 7 World Trade Center based on shop drawings.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.359
Machine-extracted titleNYC-WTC_000171840
Letter submitting Change Order #38 for $8,346.00 for unspecified scope of work at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.358
Machine-extracted titleNYC-WTC_000168638
Revised Change Order #17 submitted by Ambassador Construction for floor box installation at 7 World Trade Center dated October 22, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.357
Machine-extracted titleNYC-WTC_000171564
Ambassador Construction cover letter dated January 7, 2000 submitting change order #109 for door lock and electrical work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.357
Machine-extracted titleNYC-WTC_000168636
Change Order #19 submitted by Ambassador Construction for projector replacement and additional units at 7 World Trade Center dated October 19, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.355
Machine-extracted titleNYC-WTC_000168676
Memo submitting revised Credit Change Order #7 for fiber distribution system deletions at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.352
Machine-extracted titleNYC-WTC_000171403
Contractor submission for change order covering installation of a duplex circuit and conduit snaking on the first floor.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.351
Machine-extracted titleNYC-WTC_000173164
Change order submitted by Ambassador Construction Co. Inc. for bullet-resistant door and wall modifications at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.350
Machine-extracted titleNYC-WTC_000168373
Contractor submission for Change Order #101 to provide a wall-mounted Halotron 1 fire extinguisher.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.349
Machine-extracted titleNYC-WTC_000171331
Contractor submission of Change Order #103 for audiovisual equipment and camera installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.348
Machine-extracted titleNYC-WTC_000173896
Contractor submission of change order #075 to install two UPS units at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.342
Machine-extracted titleNYC-WTC_000168633
Change Order #19 submitted to replace 36 acoustic panels on the 7th floor as requested by the architect.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.342
Machine-extracted titleNYC-WTC_000171930
Contractor submission of change order #028 for conduit modification and wire installation at the 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.341
Machine-extracted titleNYC-WTC_000171977
Construction change order for water tank and switch gear work on the 7th floor of 7 World Trade Center, totaling $20,342.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.339
Machine-extracted titleNYC-WTC_000172153
Memo submitting change order #094 to install automatic air release valves and level indicators following a pump test.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.337
Machine-extracted titleNYC-WTC_000168478
Memo submitting Change Order #71 for $4,579 to install three-phase fields for circulation pumps at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.336
Machine-extracted titleNYC-WTC_000173303
Submission of Credit Change Order #007 by Ambassador Construction to remove fiber distribution system work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.334
Machine-extracted titleNYC-WTC_000171504
Contractor letter submitting Change Order #111 for $17,466 to insulate generator room walls and install heaters.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.332
Machine-extracted titleNYC-WTC_000173970
Transmission cover sheet from Ambassador Construction regarding work at the Mayor's Office of Emergency Management in the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.322
Machine-extracted titleNYC-WTC_000173833
Change order #002 submitted by Ambassador Construction to modify cooling tower pan construction at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.321
Machine-extracted titleNYC-WTC_000172213
Letter from Ambassador Construction submitting Change Order #37 for stainless steel cladding at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.320
Machine-extracted titleNYC-WTC_000171448
Ambassador Construction letter dated January 29, 1999, submitting Change Order #64 for $7,114 to patch cables and install wiring at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.320
Machine-extracted titleNYC-WTC_000173714
Letter submitting change order #13 for additional framing, sheetrock blocking, and fascia work at a doorframe and soffit.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.319
Machine-extracted titleNYC-WTC_000173819
A letter submitting change order #21 for structural work on the 7th floor of 7 WTC to the Department of Citywide Administrative Services.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.315
Machine-extracted titleNYC-WTC_000168656
Change order submitted to add framing sheetrock blocking at door frames and soffits on the 23rd floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.314
Machine-extracted titleNYC-WTC_000168349
Letter submitting change order #109 for door lock repairs and electrical installations at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.313
Machine-extracted titleNYC-WTC_000173189
Letter submitting credit change order #7 reducing costs by $270,023 for fiber distribution system work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.313