Electrical systems installation and permits at 7 World Trade Center

← Whole collection · Parent topic

417 indexed pages · 291 indexed documents

Construction permits, change orders, and correspondence for electrical circuits, outlets, and cable installation work at 7 World Trade Center locations.

machine-extracted · confidence 0.82 · Check page ↗

herewith · dcas · pleasure · meets · hesitate · proceed · circuits · outlets · cables · sixteen · reinstall · pole

Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.

Sub-topics

No sub-topics indexed.

Documents in this topic

Ordered by assignment probability. A document-level assignment does not establish that every page is about this subject.

Change Order #56 submission, Jan 1999

Machine-extracted title

NYC-WTC_000172220

Letter from Ambassador Construction submitting Change Order #56 for electrical outlet installation at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.440

machine-extracted · confidence 0.44 · Check page ↗

Revised Change Order #80, 7 WTC, April 1999

Machine-extracted title

NYC-WTC_000168434

Contractor submits a revised Change Order #80 for $1,631 to remove additional floor granite interfering with fuel oil piping.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.439

machine-extracted · confidence 0.44 · Check page ↗

Change order submission memo for OEM project, Feb 2000

Machine-extracted title

NYC-WTC_000168338

Letter dated February 14, 2000 submitting change order #112 for valve replacement work at Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.437

machine-extracted · confidence 0.44 · Check page ↗

Change Order #42 for wall washers, 7 WTC, Dec 1998

Machine-extracted title

NYC-WTC_000168571

Ambassador Construction submits Change Order #42 to install four type G wall washers at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.437

machine-extracted · confidence 0.44 · Check page ↗

Change Order #055, 7 World Trade Center, Jan 1999

Machine-extracted title

NYC-WTC_000171387

Contractor submission for change order covering conduit repairs and new wiring installation in loading dock and lobby areas.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.436

machine-extracted · confidence 0.44 · Check page ↗

Revised Change Order #3 Memo, 7 World Trade Center, Aug

Machine-extracted title

NYC-WTC_000168691

Memo submitting revised Change Order #003 for surge protector sub-feeds at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.436

machine-extracted · confidence 0.44 · Check page ↗

Change Order #50 for Lutron interface work at 7 World

Machine-extracted title

NYC-WTC_000168549

Memo submitting Change Order #50 to correct incompatibility between equipment and Lutron dimming interfaces.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.435

machine-extracted · confidence 0.43 · Check page ↗

Change Order #26 submission, 7 WTC, Nov 1998

Machine-extracted title

NYC-WTC_000171821

Letter from Ambassador Construction submitting change order #26 for drywall and electrical patching work at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.434

machine-extracted · confidence 0.43 · Check page ↗

Fax cover sheet for OEM change order response, Oct 1998

Machine-extracted title

NYC-WTC_000171908

Facsimile transmission cover sheet from Ambassador Construction dated October 22, 1998, regarding OEM change orders.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.434

machine-extracted · confidence 0.43 · Check page ↗

Change Order #68 for door hardware, 7 WTC, Feb 1999

Machine-extracted title

NYC-WTC_000168486

Memo submitting Change Order #68 for $406 to install an astragal on a door pair at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.433

machine-extracted · confidence 0.43 · Check page ↗

Change Order #008 for bullet-resistant door, 7 WTC, Sep 1998

Machine-extracted title

NYC-WTC_000173635

Letter from Ambassador Construction submitting Change Order #008 to upgrade a door and walls to bullet-resistant standards at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.433

machine-extracted · confidence 0.43 · Check page ↗

Change Order #091 for 7 World Trade Center Pump Installation,

Machine-extracted title

NYC-WTC_000171687

Ambassador Construction submits change order #091 for pump and drain installation to remedy leakage on the seventh floor dated July 22, 1999.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.432

machine-extracted · confidence 0.43 · Check page ↗

Change Order #87 submission, 7 WTC, June 1999

Machine-extracted title

NYC-WTC_000168412

Contractor submits Change Order #87 for $1,276 to install a UPS conversion kit in an office at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.431

machine-extracted · confidence 0.43 · Check page ↗

Change Order #022R, fiber optic cable, 7 WTC, Oct 1998

Machine-extracted title

NYC-WTC_000168626

Ambassador Construction submits Change Order #022R for installing multi-mode fiber optic cables at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.431

machine-extracted · confidence 0.43 · Check page ↗

Change order #078 for speaker work, 7 WTC, Apr 1999

Machine-extracted title

NYC-WTC_000171658

Ambassador Construction submits Change Order #078 to remove and reinstall speakers and fire devices at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.427

machine-extracted · confidence 0.43 · Check page ↗

Credit change order #14: Generator test, Oct 1998

Machine-extracted title

NYC-WTC_000173709

Letter submitting credit change order #14 to remove costs for witnessing an emergency generator field test.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.427

machine-extracted · confidence 0.43 · Check page ↗

Change Order #3 Memo, 7 World Trade Center, Aug 1998

Machine-extracted title

NYC-WTC_000168694

Memo submitting Change Order #3 for plug mold outlet installation at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.423

machine-extracted · confidence 0.42 · Check page ↗

Change order submission memo, Jan 2000

Machine-extracted title

NYC-WTC_000168347

Letter submitting change order #110 for installing astragels and a sprinkler head at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.422

machine-extracted · confidence 0.42 · Check page ↗

Change Order #019 for projector replacement, Oct 1998

Machine-extracted title

NYC-WTC_000172199

Contractor submission of change order for replacing projectors at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.420

machine-extracted · confidence 0.42 · Check page ↗

Change order #091 for pump installation at 7 World Trade

Machine-extracted title

NYC-WTC_000172393

Letter from Ambassador Construction Co. dated July 22, 1999, submitting change order #091 for $6,565 to remedy leakage issues.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.420

machine-extracted · confidence 0.42 · Check page ↗

Change order #001 for OEM Inergen reserve system, Dec 2000

Machine-extracted title

NYC-WTC_000171486

Submission of change order #001 by Ambassador Construction to install a connected reserve Inergen supply system at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.418

machine-extracted · confidence 0.42 · Check page ↗

Change Order #017 for floor boxes, 7 World Trade Center,

Machine-extracted title

NYC-WTC_000171986

Ambassador Construction submits revised change order to install combination floor boxes under the raised floor at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.416

machine-extracted · confidence 0.42 · Check page ↗

Change Order #98 submission for electrical work, 7 WTC

Machine-extracted title

NYC-WTC_000171328

Contractor submission of Change Order #98 for converting press room lights to hard-wired switches at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.416

machine-extracted · confidence 0.42 · Check page ↗

Change Order #001 for OEM renovation, July 1998

Machine-extracted title

NYC-WTC_000173783

Letter from Ambassador Construction submitting Change Order #001 for sheetrock wall offset work at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.415

machine-extracted · confidence 0.42 · Check page ↗

Change Order #009 for wood door upgrades, 7 World Trade

Machine-extracted title

NYC-WTC_000172007

Ambassador Construction submits change order to upgrade painted doors to mahogany and modify specific door numbers.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.412

machine-extracted · confidence 0.41 · Check page ↗

Change Order #26, drywall and ceilings, 7 WTC, Nov 1998

Machine-extracted title

NYC-WTC_000168609

Submission of Change Order #26 for closing door openings and patching drywall and ceilings at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.411

machine-extracted · confidence 0.41 · Check page ↗

Change Order #016R for electrical work, 7 WTC, Nov 1998

Machine-extracted title

NYC-WTC_000173884

Ambassador Construction submits Change Order #016R for $21,519 to relocate a panel and tap a transformer at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.410

machine-extracted · confidence 0.41 · Check page ↗

Change Order #022 submission, Ambassador Construction, Oct 1998

Machine-extracted title

NYC-WTC_000171910

Ambassador Construction submits Change Order #022 for fiber optic installation at the Mayor's Office of Emergency Management on October 30, 1998.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.410

machine-extracted · confidence 0.41 · Check page ↗

Change Order #018, projector replacement, 7 WTC, Oct 1998

Machine-extracted title

NYC-WTC_000168634

Ambassador Construction submits Change Order #018 to replace projectors with Sharp XG-E3500U models at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.408

machine-extracted · confidence 0.41 · Check page ↗

Change Order #85 for fuel-oil line route adjustment, May 1999

Machine-extracted title

NYC-WTC_000172365

Ambassador Construction submits Change Order #85 for $34,401 to adjust fuel-oil line routing in elevator pits at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.408

machine-extracted · confidence 0.41 · Check page ↗

Change Order #002 submission for hatch door switch, 7 WTC,

Machine-extracted title

NYC-WTC_000171419

Ambassador Construction submits Change Order #002 to furnish and install a disconnect switch for a hatch door release at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.407

machine-extracted · confidence 0.41 · Check page ↗

Change Order #16R electrical work, 7 WTC, Nov 1998

Machine-extracted title

NYC-WTC_000168642

Revised Change Order #16R submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated November 13, 1998.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.407

machine-extracted · confidence 0.41 · Check page ↗

Change Order #26 for drywall and electrical work, 7 World

Machine-extracted title

NYC-WTC_000173876

A memo submits Change Order #26 for $12,599 to close door openings, patch ceilings, and modify electrical systems at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.406

machine-extracted · confidence 0.41 · Check page ↗

Change Order #50 for lighting system modules, Jan 1999

Machine-extracted title

NYC-WTC_000171866

Ambassador Construction submits Change Order #50 to install Crestron modules and resolve dimming system incompatibilities.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.404

machine-extracted · confidence 0.40 · Check page ↗

Change Order #38 for drain installation, 7 WTC, Dec 1998

Machine-extracted title

NYC-WTC_000168581

Ambassador Construction submits Change Order #38 to install additional drains in toilets and a sprinkler closet at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.404

machine-extracted · confidence 0.40 · Check page ↗

Change order #009, 7 World Trade Center, September 1998

Machine-extracted title

NYC-WTC_000173180

Change order from Ambassador Construction regarding wood door modifications at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.403

machine-extracted · confidence 0.40 · Check page ↗

Change order #106 cover letter, Dec 7 1999

Machine-extracted title

NYC-WTC_000171588

Ambassador Construction cover letter dated December 7, 1999 submitting change order #106 for PESA front panel control installation at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.400

machine-extracted · confidence 0.40 · Check page ↗

Change Order #024, monitor cabling, 7 WTC, Nov 1998

Machine-extracted title

NYC-WTC_000168619

Ambassador Construction submits Change Order #024 for installing cabling and control systems for monitors and projectors.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.397

machine-extracted · confidence 0.40 · Check page ↗

Change order #020 from Ambassador Construction, Oct 1998

Machine-extracted title

NYC-WTC_000171975

Change order submission by Ambassador Construction for electrical work at the Mayor's Office of Emergency Management in October 1998.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.396

machine-extracted · confidence 0.40 · Check page ↗

Change Order #3 submission, 7 WTC, Aug 1998

Machine-extracted title

NYC-WTC_000172026

Cover sheet and scope of work for Change Order #3 submitted by Ambassador Construction Co. Inc. to [name] Properties at 7 World Trade Center on August 26, 1998.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.394

machine-extracted · confidence 0.39 · Check page ↗

Change Order #063 memo, 7 WTC, Jan 1999

Machine-extracted title

NYC-WTC_000168504

Memo from Ambassador Construction submitting Change Order #063 for $1,912 to install a pipe sleeve and cabling at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.393

machine-extracted · confidence 0.39 · Check page ↗

Change order #12: Switch upgrade, 7 WTC, Oct 1998

Machine-extracted title

NYC-WTC_000173701

Letter submitting Change Order #12 to install meters and upgrade a 2500 amp switch at the Mayor's Office.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.393

machine-extracted · confidence 0.39 · Check page ↗