Documents in this topic
Ordered by assignment probability. A document-level assignment does not establish that every page is about this subject.
Machine-extracted titleNYC-WTC_000172220
Letter from Ambassador Construction submitting Change Order #56 for electrical outlet installation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.440
Machine-extracted titleNYC-WTC_000168434
Contractor submits a revised Change Order #80 for $1,631 to remove additional floor granite interfering with fuel oil piping.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.439
Machine-extracted titleNYC-WTC_000168338
Letter dated February 14, 2000 submitting change order #112 for valve replacement work at Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.437
Machine-extracted titleNYC-WTC_000168571
Ambassador Construction submits Change Order #42 to install four type G wall washers at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.437
Machine-extracted titleNYC-WTC_000171387
Contractor submission for change order covering conduit repairs and new wiring installation in loading dock and lobby areas.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.436
Machine-extracted titleNYC-WTC_000168691
Memo submitting revised Change Order #003 for surge protector sub-feeds at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.436
Machine-extracted titleNYC-WTC_000168549
Memo submitting Change Order #50 to correct incompatibility between equipment and Lutron dimming interfaces.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.435
Machine-extracted titleNYC-WTC_000171821
Letter from Ambassador Construction submitting change order #26 for drywall and electrical patching work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.434
Machine-extracted titleNYC-WTC_000171908
Facsimile transmission cover sheet from Ambassador Construction dated October 22, 1998, regarding OEM change orders.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.434
Machine-extracted titleNYC-WTC_000168486
Memo submitting Change Order #68 for $406 to install an astragal on a door pair at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.433
Machine-extracted titleNYC-WTC_000173635
Letter from Ambassador Construction submitting Change Order #008 to upgrade a door and walls to bullet-resistant standards at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.433
Machine-extracted titleNYC-WTC_000171687
Ambassador Construction submits change order #091 for pump and drain installation to remedy leakage on the seventh floor dated July 22, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.432
Machine-extracted titleNYC-WTC_000168696
Letter from Ambassador Construction submitting Change Order #2 for cooling tower work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.432
Machine-extracted titleNYC-WTC_000168412
Contractor submits Change Order #87 for $1,276 to install a UPS conversion kit in an office at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.431
Machine-extracted titleNYC-WTC_000168626
Ambassador Construction submits Change Order #022R for installing multi-mode fiber optic cables at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.431
Machine-extracted titleNYC-WTC_000171939
Ambassador Construction change order #031 for installing security wire in conduits at the 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.428
Machine-extracted titleNYC-WTC_000171658
Ambassador Construction submits Change Order #078 to remove and reinstall speakers and fire devices at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.427
Machine-extracted titleNYC-WTC_000173709
Letter submitting credit change order #14 to remove costs for witnessing an emergency generator field test.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.427
Machine-extracted titleNYC-WTC_000168396
Letter submitting change order #92 to install a kindoff on a wall in the press room for $380.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.425
Machine-extracted titleNYC-WTC_000168694
Memo submitting Change Order #3 for plug mold outlet installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.423
Machine-extracted titleNYC-WTC_000168347
Letter submitting change order #110 for installing astragels and a sprinkler head at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.422
Machine-extracted titleNYC-WTC_000172199
Contractor submission of change order for replacing projectors at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.420
Machine-extracted titleNYC-WTC_000172393
Letter from Ambassador Construction Co. dated July 22, 1999, submitting change order #091 for $6,565 to remedy leakage issues.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.420
Machine-extracted titleNYC-WTC_000171486
Submission of change order #001 by Ambassador Construction to install a connected reserve Inergen supply system at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.418
Machine-extracted titleNYC-WTC_000171986
Ambassador Construction submits revised change order to install combination floor boxes under the raised floor at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.416
Machine-extracted titleNYC-WTC_000171328
Contractor submission of Change Order #98 for converting press room lights to hard-wired switches at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.416
Machine-extracted titleNYC-WTC_000173783
Letter from Ambassador Construction submitting Change Order #001 for sheetrock wall offset work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.415
Machine-extracted titleNYC-WTC_000172007
Ambassador Construction submits change order to upgrade painted doors to mahogany and modify specific door numbers.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.412
Machine-extracted titleNYC-WTC_000172005
Ambassador Construction details scope and cost for upgrading a door and surrounding walls to Level 3 bullet resistance.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.411
Machine-extracted titleNYC-WTC_000168609
Submission of Change Order #26 for closing door openings and patching drywall and ceilings at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.411
Machine-extracted titleNYC-WTC_000173884
Ambassador Construction submits Change Order #016R for $21,519 to relocate a panel and tap a transformer at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.410
Machine-extracted titleNYC-WTC_000171910
Ambassador Construction submits Change Order #022 for fiber optic installation at the Mayor's Office of Emergency Management on October 30, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.410
Machine-extracted titleNYC-WTC_000168634
Ambassador Construction submits Change Order #018 to replace projectors with Sharp XG-E3500U models at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.408
Machine-extracted titleNYC-WTC_000172365
Ambassador Construction submits Change Order #85 for $34,401 to adjust fuel-oil line routing in elevator pits at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.408
Machine-extracted titleNYC-WTC_000171419
Ambassador Construction submits Change Order #002 to furnish and install a disconnect switch for a hatch door release at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.407
Machine-extracted titleNYC-WTC_000168642
Revised Change Order #16R submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated November 13, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.407
Machine-extracted titleNYC-WTC_000171932
Contractor submission of change order #029 to install two duplex outlets and a switch in the training room.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.407
Machine-extracted titleNYC-WTC_000173876
A memo submits Change Order #26 for $12,599 to close door openings, patch ceilings, and modify electrical systems at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.406
Machine-extracted titleNYC-WTC_000171866
Ambassador Construction submits Change Order #50 to install Crestron modules and resolve dimming system incompatibilities.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.404
Machine-extracted titleNYC-WTC_000168581
Ambassador Construction submits Change Order #38 to install additional drains in toilets and a sprinkler closet at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.404
Machine-extracted titleNYC-WTC_000173180
Change order from Ambassador Construction regarding wood door modifications at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.403
Machine-extracted titleNYC-WTC_000171588
Ambassador Construction cover letter dated December 7, 1999 submitting change order #106 for PESA front panel control installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.400
Machine-extracted titleNYC-WTC_000173825
A letter submitting a revised change order #17 regarding floor boxes at the Mayor's Office of Emergency Management in 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.398
Machine-extracted titleNYC-WTC_000172152
Memo submitting change order #087 to install a UPS conversion kit allowing direct power input and output in the office.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.398
Machine-extracted titleNYC-WTC_000168619
Ambassador Construction submits Change Order #024 for installing cabling and control systems for monitors and projectors.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.397
Machine-extracted titleNYC-WTC_000172368
DCAS official submits Change Order #87 for a UPS conversion kit installation in an office at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.397
Machine-extracted titleNYC-WTC_000171975
Change order submission by Ambassador Construction for electrical work at the Mayor's Office of Emergency Management in October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.396
Machine-extracted titleNYC-WTC_000172026
Cover sheet and scope of work for Change Order #3 submitted by Ambassador Construction Co. Inc. to [name] Properties at 7 World Trade Center on August 26, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.394
Machine-extracted titleNYC-WTC_000168504
Memo from Ambassador Construction submitting Change Order #063 for $1,912 to install a pipe sleeve and cabling at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.393
Machine-extracted titleNYC-WTC_000173701
Letter submitting Change Order #12 to install meters and upgrade a 2500 amp switch at the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.393