Electrical systems installation and permits at 7 World Trade Center

← Whole collection · Parent topic

417 indexed pages · 291 indexed documents

Construction permits, change orders, and correspondence for electrical circuits, outlets, and cable installation work at 7 World Trade Center locations.

machine-extracted · confidence 0.82 · Check page ↗

herewith · dcas · pleasure · meets · hesitate · proceed · circuits · outlets · cables · sixteen · reinstall · pole

Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.

Sub-topics

No sub-topics indexed.

Documents in this topic

Ordered by assignment probability. A document-level assignment does not establish that every page is about this subject.

Change order #019 for OEM, 7 World Trade Center, Oct

Machine-extracted title

NYC-WTC_000171973

Submission of change order #019 by Ambassador Construction Co. to replace acoustic panels at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.481

machine-extracted · confidence 0.48 · Check page ↗

Change Order #65 submission, 7 WTC, Jan 1999

Machine-extracted title

NYC-WTC_000171799

Letter from Ambassador Construction submitting change order #65 for X-ray and video equipment at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.480

machine-extracted · confidence 0.48 · Check page ↗

Change Order #031, 7 World Trade Center, Nov 1998

Machine-extracted title

NYC-WTC_000173864

Ambassador Construction submits change order #031 for security wire installation at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.480

machine-extracted · confidence 0.48 · Check page ↗

Credit change order #014 for OEM, 7 World Trade Center,

Machine-extracted title

NYC-WTC_000171981

Submission of credit change order #014 by Ambassador Construction Co. to remove costs for emergency generator field testing.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.480

machine-extracted · confidence 0.48 · Check page ↗

NYC-WTC_000171916

NYC-WTC_000171916

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.479

machine-extracted · confidence 0.48 · Check page ↗

Change order #043, RG-6U cable, 7 World Trade, Dec 1998

Machine-extracted title

NYC-WTC_000171860

Letter detailing Change Order #043 for RG-6U plenum cable supply and installation at the Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.478

machine-extracted · confidence 0.48 · Check page ↗

Change Order #099 proposal for 7 World Trade Center circuits,

Machine-extracted title

NYC-WTC_000171345

Request to furnish and install separate electrical circuits in executive and hallway areas of the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.476

machine-extracted · confidence 0.48 · Check page ↗

Change order #12 for switch upgrade at 7 WTC, Oct

Machine-extracted title

NYC-WTC_000173712

Letter submitting change order #12 to increase the size of a 2500 amp switch and install voltmeter and ammeter equipment.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.475

machine-extracted · confidence 0.47 · Check page ↗

Change Order #006 for bullet resistant door, 7 World Trade

Machine-extracted title

NYC-WTC_000172003

Ambassador Construction submits change order to furnish a Level 3 bullet-resistant door at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.474

machine-extracted · confidence 0.47 · Check page ↗

Change Order #057, 7 World Trade Center, Jan 1999

Machine-extracted title

NYC-WTC_000171395

Contractor submission for change order covering security system installation including magnetic locks and exit buttons.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.472

machine-extracted · confidence 0.47 · Check page ↗

Credit change order #084 for 7 World Trade Center, Apr

Machine-extracted title

NYC-WTC_000171678

Ambassador Construction submits credit change order #084 for TV monitor work at 7 World Trade Center dated April 27, 1999.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.471

machine-extracted · confidence 0.47 · Check page ↗

Letter regarding Change Order #006, September 1998

Machine-extracted title

NYC-WTC_000173467

Letter from Ambassador Construction submitting Change Order #006 for a bullet-resistant door at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.471

machine-extracted · confidence 0.47 · Check page ↗

Change order #91 for MOEM HVAC repair, August 1999

Machine-extracted title

NYC-WTC_000172578

Memo submitting change order #91 for $6,565 to remedy water leakage on the 7th floor of 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.469

machine-extracted · confidence 0.47 · Check page ↗

Credit Change Order #27, LAN room painting, 7 WTC, Nov

Machine-extracted title

NYC-WTC_000168601

Submission of Credit Change Order #27 for painting the LAN room floor instead of installing VCT flooring at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.467

machine-extracted · confidence 0.47 · Check page ↗

Change order #011 from Ambassador Construction, Oct 1998

Machine-extracted title

NYC-WTC_000171980

Change order submission by Ambassador Construction for door modifications at the Mayor's Office of Emergency Management in October 1998.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.467

machine-extracted · confidence 0.47 · Check page ↗

Change Order #51 for shelving adjustments, Jan 1999

Machine-extracted title

NYC-WTC_000171870

Ambassador Construction submits Change Order #51 detailing height adjustments and unit additions to adjustable shelving units.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.465

machine-extracted · confidence 0.47 · Check page ↗

Change order #102 cover letter, Oct 29 1999

Machine-extracted title

NYC-WTC_000171585

Ambassador Construction cover letter dated October 29, 1999 submitting change order #102 for data box and outlet installation at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.465

machine-extracted · confidence 0.47 · Check page ↗

Change Order #11 door replacement, 7 WTC, Oct 1998

Machine-extracted title

NYC-WTC_000168660

Change Order #11 submitted by Ambassador Construction to replace a hollow metal and glass door at 7 World Trade Center dated October 1, 1998.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.464

machine-extracted · confidence 0.46 · Check page ↗

Change Order #059 memo, 7 WTC, Jan 1999

Machine-extracted title

NYC-WTC_000168519

Memo from Ambassador Construction submitting Change Order #059 for $10,948 to install a duplex circuit and drag line on the first floor of 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.464

machine-extracted · confidence 0.46 · Check page ↗

Change Order #26R submission, 7 WTC, Dec 1998

Machine-extracted title

NYC-WTC_000171810

Letter from Ambassador Construction submitting revised change order #26R for repairs at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.462

machine-extracted · confidence 0.46 · Check page ↗

Credit Change Order #14 generator test, 7 WTC, Oct 1998

Machine-extracted title

NYC-WTC_000168653

Credit Change Order #14 submitted by Ambassador Construction to delete costs for emergency generator field test witnessing at 7 World Trade Center dated October 7, 1998.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.462

machine-extracted · confidence 0.46 · Check page ↗

Change Order #30, concrete pad and drilling, 7 WTC, Nov

Machine-extracted title

NYC-WTC_000168595

Submission of Change Order #30 for a new UPS concrete pad and drilling into roof slabs at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.461

machine-extracted · confidence 0.46 · Check page ↗

Change order #11: Door modification, 7 WTC, Oct 1998

Machine-extracted title

NYC-WTC_000173706

Letter submitting Change Order #11 to modify door 05 from hollow metal and glass at the Mayor's Office.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.461

machine-extracted · confidence 0.46 · Check page ↗

Change Order #69 for hardware, 7 WTC, Feb 1999

Machine-extracted title

NYC-WTC_000168484

Memo submitting Change Order #69 for $780 to furnish keys, chains, and door closers at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.460

machine-extracted · confidence 0.46 · Check page ↗

Change order #012 from Ambassador Construction, Oct 1998

Machine-extracted title

NYC-WTC_000171968

Change order submission by Ambassador Construction for electrical work at the Mayor's Office of Emergency Management in October 1998.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.459

machine-extracted · confidence 0.46 · Check page ↗

Change Order #64 for LAN cabling, 7 WTC, Feb 1999

Machine-extracted title

NYC-WTC_000168501

Memo submitting Change Order #64 for $7,114 to provide manpower for patching cables in the LAN room at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.459

machine-extracted · confidence 0.46 · Check page ↗

Memo submitting Change Order #039, Dec 1998

Machine-extracted title

NYC-WTC_000171889

Ambassador Construction submits Change Order #039 for USM furniture and plates at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.457

machine-extracted · confidence 0.46 · Check page ↗

Change Order #12 switch installation, 7 WTC, Oct 1998

Machine-extracted title

NYC-WTC_000168658

Change Order #12 submitted by Ambassador Construction for voltmeter and ammeter installation on a 2500 amp switch at 7 World Trade Center dated October 5, 1998.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.457

machine-extracted · confidence 0.46 · Check page ↗

Change Order #85 submission, 7 WTC, May 1999

Machine-extracted title

NYC-WTC_000168422

Contractor submits Change Order #85 for $34,401 to install new piping for re-routed fuel oil lines, including masonry work.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.457

machine-extracted · confidence 0.46 · Check page ↗

Change Order #068 submission, Feb 1999

Machine-extracted title

NYC-WTC_000172221

Letter from Ambassador Construction submitting Change Order #068 for door astragal installation at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.455

machine-extracted · confidence 0.45 · Check page ↗

Change order #006, 7 World Trade Center, September 1998

Machine-extracted title

NYC-WTC_000173182

Change order from Ambassador Construction for furnishing a bullet-resistant door at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.454

machine-extracted · confidence 0.45 · Check page ↗

Change Order #8 Memo, 7 World Trade Center, Sept 1998

Machine-extracted title

NYC-WTC_000168666

Memo submitting revised Change Order #8 for bullet-resistant door installation at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.453

machine-extracted · confidence 0.45 · Check page ↗

Change order #91 submission, 7 WTC, July 1999

Machine-extracted title

NYC-WTC_000168399

Letter from Ambassador Construction submitting change order #91 for $6,565 to remedy leakage on the 7th floor of 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.452

machine-extracted · confidence 0.45 · Check page ↗

Change order #19 transmittal, 7 World Trade Center, Oct 1998

Machine-extracted title

NYC-WTC_000173823

A letter submitting change order #19 for the replacement of acoustic panels at the Mayor's Office of Emergency Management in 7 WTC.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.451

machine-extracted · confidence 0.45 · Check page ↗

Change Order #030 for concrete pad and drilling, Nov 1998

Machine-extracted title

NYC-WTC_000171934

Ambassador Construction change order #030 detailing costs for a concrete pad, drilling, and oil leak detection basin.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.446

machine-extracted · confidence 0.45 · Check page ↗

Change Order #85, 7 World Trade Center, May 1999

Machine-extracted title

NYC-WTC_000172231

Submission of Change Order #85 for $34,401 for additional work related to fuel-oil line routing at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.444

machine-extracted · confidence 0.44 · Check page ↗

Change Order #003 for Ambassador Construction, Aug 21, 1998

Machine-extracted title

NYC-WTC_000173748

Formal change order submitted by Ambassador Construction to perform work on plug mold outlets and A/V cabling at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.443

machine-extracted · confidence 0.44 · Check page ↗

Change Order #107 for OEM Painting Work, Dec 1999

Machine-extracted title

NYC-WTC_000171592

Ambassador Construction submits Change Order #107 for painting the smoke room at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.442

machine-extracted · confidence 0.44 · Check page ↗

Ambassador Construction Change Order #85, May 1999

Machine-extracted title

NYC-WTC_000172338

Memo from Ambassador Construction submitting Change Order #85 for fuel oil piping work at the Mayor's Office of Emergency Management.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.441

machine-extracted · confidence 0.44 · Check page ↗

Cover Letter for Change Order #112, 7 WTC, Feb 2000

Machine-extracted title

NYC-WTC_000171517

Cover letter submitting Change Order #112 for the replacement of an anti-siphon valve with a check valve at 7 World Trade Center.

Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.440

machine-extracted · confidence 0.44 · Check page ↗