Change Order #38 for drain installation, 7 WTC, Dec 1998

Machine-extracted title · confidence 95%

Ambassador Construction submits Change Order #38 to install additional drains in toilets and a sprinkler closet at 7 World Trade Center.

NYC-WTC_000168581

Folder label: “7th Floor Louvers 7 World Trade Center Change Order #038 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000168581
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AMBASSADOR CONSTRUCTION CO. INC.

0 Mr. Walter Weems Silverstein Properties Inc. December 4, 1998

7 World Trade Center New York, NY 10048

Re; 7th Floor Louvers 7 World Trade Center Change Order #038 Amb. Job #357-5175

Dear Mr. Weems:

We are pleased to submit herewith our change order #038 to perform the following work at the above referenced premises for the sum of EIGHT THOUSAND THREE HUNDRED FORTY SIX DOLLARS ($8,346.00).

As per SKP-3 and SKP-4 for additional drains in H.C. toilets 23-32, 23-3 and for installing a new drain in sprinkler closet 23-22 the costs are; ► Plumbing work with overtime for floor below $5,700.00 »• Patching ceiling with overtime _J,50Q.0Q Subtotal $7,200.00 General Conditions 576.00 Overhead and Fee 467.00 Insurance 103.00 Total $8,346.00

We are proceeding with this work, so this will not cause a delay in those rooms.

We trust the above meets with your approval and we look forward to the continued pleasure of serving you.

Please sign one copy of this letter and return it to our office for our records

If you have any questions, please do not hesitate to contact us.

Very truly yours.

AMBASSADOR CONSTRUCTK^CO., INC.

—- Martin Schneider Vice President

MS;am Accepted: Dated; h»emxcos'C5h^^^I50,^ YORK, NY 10017, 212 922 1020, FAX 212 949 9762

NYC-WTC_000168581

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168581Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #37 submission, Nov 1998 · Box 7DCAS

NYC-WTC_000172213

Letter from Ambassador Construction submitting Change Order #37 for stainless steel cladding at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959

machine-extracted · confidence unavailable · Check page ↗
Change Order #23 submission, 7 WTC, Nov 1998 · Box 7DCAS

NYC-WTC_000171804

Letter from Ambassador Construction submitting change order #23 for steel reinforcement work at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168583 · Box 7DCAS

Memo submitting Change Order #37 to install polished stainless steel cladding around window mullions at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168460 · Box 7DCAS

Contractor submits Change Order #76 for $701 to relocate a cold water make-up line at 7 World Trade Center.

Similar indexed content

NYC-WTC_000173862 · Box 7DCAS

Ambassador Construction submits Change Order #32 to construct a new coat closet in room 23-09 at 7 World Trade Center.

Similar indexed content

NYC-WTC_000172213 · Box 7DCAS

Letter from Ambassador Construction submitting Change Order #37 for stainless steel cladding at 7 World Trade Center.