No sub-topics indexed.
Documents in this topic
Ordered by assignment probability. A document-level assignment does not establish that every page is about this subject.
Machine-extracted titleNYC-WTC_000173438
Letter submitting a budget estimate for constructing the hurricane wall at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.310
Machine-extracted titleNYC-WTC_000167660
Letter from Ambassador Construction notifying DCAS of the removal of eight TV monitors and supports in the EOC at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.309
Machine-extracted titleNYC-WTC_000173672
Request for information regarding additional fuel oil piping protection in the generator room at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.302
Machine-extracted titleNYC-WTC_000172808
Construction estimate for cabinetry, shelving, and wall paneling for Mayor's Office at 7 World Trade Center 23rd floor, itemized by room with materials and pricing.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.300
Machine-extracted titleNYC-WTC_000172303
Bid document from KS Inc. detailing structural steel framing and metal decking work for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.299
Machine-extracted titleNYC-WTC_000173663
Log of incoming and outgoing faxes between Ambassador Construction and the Office of Emergency Management regarding project communications.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.297
Machine-extracted titleNYC-WTC_000172718
Proposal from [name] & Wallcovering, Inc. for painting and wallcovering work at the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.293
Machine-extracted titleNYC-WTC_000171308
Construction proposal to furnish and erect an interior sidewalk shed and scaffold enclosure at the lobby of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.292
Machine-extracted titleNYC-WTC_000168528
Memo submitting Change Order #55 for repairing conduits damaged during concrete chopping at the loading dock.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.288
Machine-extracted titleNYC-WTC_000172806
Revised construction estimate for cabinetry, shelving, reception desk, and wall paneling for Mayor's Office at 7 World Trade Center 23rd floor.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.286
Machine-extracted titleNYC-WTC_000172604
Quotation from Penguin Air Conditioning Corp for HVAC work at the Mayor's Office in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.278
Machine-extracted titleNYC-WTC_000172597
Itemized cost breakdown for HVAC work including controls, economizer coils, dampers, insulation, ductwork, and piping totaling $104,676, dated June 9, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.277
Machine-extracted titleNYC-WTC_000171513
Architectural memorandum providing recommendations for insulating the generator room at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.273
Machine-extracted titleNYC-WTC_000174010
A letter detailing costs and specifications for video interface equipment installation at the Mayor's Office of Emergency Management in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.269
Machine-extracted titleNYC-WTC_000171595
OEM facilities manager requests approval for $665 painting work in storeroom at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.269
Machine-extracted titleNYC-WTC_000171303
Contractor submission of change order #088 to install new fuel oil piping and relocate ductwork at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.269
Machine-extracted titleNYC-WTC_000171748
Proposal from York Scaffold Equipment Corporation to furnish interior scaffolding in the 7 World Trade Center lobby.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.268
Machine-extracted titleNYC-WTC_000172328
Fax from KABACK detailing cost adjustments for HVAC controls and dampers at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.266
Machine-extracted titleNYC-WTC_000172747
Proposal from L.I.C. Construction Inc. to supply labor and materials for CMU, concrete, and fireproofing at a specified location.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.262
Machine-extracted titleNYC-WTC_000173773
Log of requests for information regarding HVAC duct interference with partitions at the Mayor's Office of Emergency Management site.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.261
Machine-extracted titleNYC-WTC_000172731
Cover sheet for a fax transmission from Burgess Steel estimating department regarding structural steel work.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.257
Machine-extracted titleNYC-WTC_000173058
Proposal document outlining scope of work for structural steel framing and metal decking installation.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.256
Machine-extracted titleNYC-WTC_000172335
Quotation from Penguin Air Conditioning Corp for HVAC work at the Mayor's Office of Emergency Management with exclusions listed.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.256
Machine-extracted titleNYC-WTC_000171909
Contractor correspondence stating that electrical panels were approved without notation but work remains unexecuted as of October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.253
Machine-extracted titleNYC-WTC_000171343
Cost breakdown for enclosing shafts and columns at the ground and second floors of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.252
Machine-extracted titleNYC-WTC_000173323
Unfilled facsimile transmission cover sheet from a Lynbrook address dated June 1998, likely related to construction or maintenance at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.249
Machine-extracted titleNYC-WTC_000172851
Letter dated May 26, 1998 from Geiger Roofing Company proposing roofing services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.247
Machine-extracted titleNYC-WTC_000172204
Invoice from Precision Interiors for framing and trim work on a new closet at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.245
Machine-extracted titleNYC-WTC_000171864
Quotation for a hurricane-resistant access panel with specific dimensions and hardware for the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.245
Machine-extracted titleNYC-WTC_000173125
Letter from Kaback Enterprises regarding HVAC louvers and dampers for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.244
Machine-extracted titleNYC-WTC_000173163
Itemized list of charges from Ambassador Construction for work performed at the Mayor's Office of Emergency Management site in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.244
Machine-extracted titleNYC-WTC_000173628
Timeline chart outlining trade activities including drywall, HVAC, steel, and sprinkler installation from July to December 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.242
Machine-extracted titleNYC-WTC_000171558
Material and labor quotation from architectural hardware supplier for astragal installation at 7 World Trade Center 23rd floor.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.239
Machine-extracted titleNYC-WTC_000171510
Quote for two 25 KW electric unit heaters for 7 World Trade Center generator room priced at $3,100.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.239
Machine-extracted titleNYC-WTC_000172847
Proposal from L.I.C. Construction Inc. dated May 20, 1998 to supply labor and materials for concrete and fireproofing at the 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.236
Machine-extracted titleNYC-WTC_000172698
Fax cover sheet from Penguin Air Conditioning submitting an HVAC estimate for the Mayor's Office on floors 1, 7, and 23 at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.236
Machine-extracted titleNYC-WTC_000171900
Quotation for electrical modifications including panel relocation, transformer work, dishwasher connection, and fire alarm.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.232
Machine-extracted titleNYC-WTC_000172503
Revised electrical work proposal from Forest Electric Corp for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.227
Machine-extracted titleNYC-WTC_000171675
Letter from Kaback regarding change order for installing recessed lighting boxes at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.226
Machine-extracted titleNYC-WTC_000171511
Construction estimate for partition insulation, drywall work, and hardware installation on 7th floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.220
Machine-extracted titleNYC-WTC_000172046
Cost breakdown for the supply and installation of 38 motors at 7 World Trade Center submitted by Ambassador Construction Co. Inc. dated September 14, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.216
Machine-extracted titleNYC-WTC_000172742
Proposal from L.I.C. Construction Inc. to supply labor and materials for CMU, concrete, and fireproofing work.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.204
Machine-extracted titleNYC-WTC_000172206
Quotation from a hardware supplier to supply finish hardware for the Mayor's Office of Emergency Management room.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.198
Machine-extracted titleNYC-WTC_000171753
Ambassador Construction Company document detailing a subcontractor estimate for demolition and temporary power required for fuel oil piping work on the first floor.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.198
Machine-extracted titleNYC-WTC_000167732
Letter from Ambassador Construction describing existing fuel oil lines and fireproofing details within the shaft at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.192
Machine-extracted titleNYC-WTC_000171772
Letter requesting overtime work for fuel oil piping at the Office of Emergency Management with a quoted price of $19,500.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.188
Machine-extracted titleNYC-WTC_000172843
Proposal from International Blind Contractors Ltd. dated May 19, 1998 to install blinds and shades at the 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.181
Machine-extracted titleNYC-WTC_000172845
Proposal from ACME Architectural Walls dated May 21, 1998 to furnish and install metal and glass partitions at the 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.179
Machine-extracted titleNYC-WTC_000167322
Construction letter describing existing fuel oil lines and fireproofing in the shaft at the Office of Emergency Management location.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.171
Machine-extracted titleNYC-WTC_000171750
Transmittal letter accompanying a scaffold proposal for the 7 World Trade Center jobsite.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.167