Subcontractor cost letter for fuel line work, March 1999 · Box 7DCASNYC-WTC_000171763
Letter from Kaback Enterprises stating additional costs of $12,500 for new fuel oil piping route at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.933
Memo regarding fuel line route and weld requirements, June 1999 · Box 7DCASNYC-WTC_000171313
Letter detailing required additional welds and pipe length for a new fuel line route at 7 World Trade Center.
1 shared non-person entities · Same agency, volume and box · similarity 0.923
Fuel oil piping quote, 7 World Trade Center, Dec 1998 · Box 7DCASNYC-WTC_000171772
Letter requesting overtime work for fuel oil piping at the Office of Emergency Management with a quoted price of $19,500.
Same agency, volume and box · similarity 0.921
HVAC construction cost breakdown, 7 World Trade Center, June 1998 · Box 7DCASNYC-WTC_000172597
Itemized cost breakdown for HVAC work including controls, economizer coils, dampers, insulation, ductwork, and piping totaling $104,676, dated June 9, 1998.
1 shared non-person entities · Same agency, volume and box · similarity 0.909
HVAC cost breakdown fax, June 1998 · Box 7DCASNYC-WTC_000172328
Fax from KABACK detailing cost adjustments for HVAC controls and dampers at the Mayor's Office of Emergency Management.
1 shared non-person entities · Same agency, volume and box · similarity 0.907
Letter describing fuel oil lines, March 1998 · Box 7DCASNYC-WTC_000167322
Construction letter describing existing fuel oil lines and fireproofing in the shaft at the Office of Emergency Management location.
1 shared topics · Same agency, volume and box · similarity 0.901
Change Order #088 for fuel oil piping, 7 World Trade · Box 7DCASNYC-WTC_000171303
Contractor submission of change order #088 to install new fuel oil piping and relocate ductwork at 7 World Trade Center.
Same agency, volume and box · similarity 0.900
Letter describing existing fuel oil lines at 7 WTC, Mar · Box 7DCASNYC-WTC_000167732
Letter from Ambassador Construction describing existing fuel oil lines and fireproofing details within the shaft at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.897
Revised change order #044R for fuel lines, 7 WTC, March · Box 7DCASNYC-WTC_000171758
Revised change order from Ambassador Construction Company detailing costs and scope for supporting and encasing fuel oil lines at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.896
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCASNYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
Same agency, volume and box · similarity 0.894
Change Order #88 submission, 7 WTC, June 1999 · Box 7DCASNYC-WTC_000168409
Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.893
Change order #088 for fuel oil piping, 7 WTC, June · Box 7DCASNYC-WTC_000171741
Change order from Ambassador Construction Company authorizing work on new fuel oil piping routes for the Mayor's Office of Emergency Management at 7 World Trade Center.