Fuel oil piping quote, 7 World Trade Center, Dec 1998 · Box 7DCASNYC-WTC_000171772
Letter requesting overtime work for fuel oil piping at the Office of Emergency Management with a quoted price of $19,500.
1 shared topics · Same agency, volume and box · similarity 0.954
Subcontractor estimate for fuel oil piping demo, June 1999 · Box 7DCASNYC-WTC_000171753
Ambassador Construction Company document detailing a subcontractor estimate for demolition and temporary power required for fuel oil piping work on the first floor.
Same agency, volume and box · similarity 0.933
HVAC cost breakdown fax, June 1998 · Box 7DCASNYC-WTC_000172328
Fax from KABACK detailing cost adjustments for HVAC controls and dampers at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.915
HVAC construction cost breakdown, 7 World Trade Center, June 1998 · Box 7DCASNYC-WTC_000172597
Itemized cost breakdown for HVAC work including controls, economizer coils, dampers, insulation, ductwork, and piping totaling $104,676, dated June 9, 1998.
1 shared topics · Same agency, volume and box · similarity 0.910
Memo regarding fuel line route and weld requirements, June 1999 · Box 7DCASNYC-WTC_000171313
Letter detailing required additional welds and pipe length for a new fuel line route at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.898
Letter regarding OEM Bulletin #1 sheetmetal work, Aug 24 1998 · Box 7DCASNYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
1 shared topics · Same agency, volume and box · similarity 0.895
Revised change order #044R for fuel lines, 7 WTC, March · Box 7DCASNYC-WTC_000171758
Revised change order from Ambassador Construction Company detailing costs and scope for supporting and encasing fuel oil lines at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.894
Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCASNYC-WTC_000172054
Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.
1 shared topics · Same agency, volume and box · similarity 0.891
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCASNYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.889
HVAC construction estimate, 7 World Trade Center, Sept 1990 · Box 7DCASNYC-WTC_000173169
Faxed estimate from HVAC contractor for construction work at 7 World Trade Center facility, dated September 1990.
Same agency, volume and box · similarity 0.888
Change order for recessed lighting, 7 WTC, Feb 1999 · Box 7DCASNYC-WTC_000171675
Letter from Kaback regarding change order for installing recessed lighting boxes at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.888
Kaback Enterprises HVAC quote for OEM, June 1998 · Box 7DCASNYC-WTC_000173125
Letter from Kaback Enterprises regarding HVAC louvers and dampers for the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.887