Same-box records
Fuel oil piping quote, 7 World Trade Center, Dec 1998 · Box 7DCASNYC-WTC_000171772
Letter requesting overtime work for fuel oil piping at the Office of Emergency Management with a quoted price of $19,500.
1 shared topics · Same agency, volume and box · similarity 0.954
Subcontractor estimate for fuel oil piping demo, June 1999 · Box 7DCASNYC-WTC_000171753
Ambassador Construction Company document detailing a subcontractor estimate for demolition and temporary power required for fuel oil piping work on the first floor.
1 shared topics · Same agency, volume and box · similarity 0.933
HVAC cost breakdown fax, June 1998 · Box 7DCASNYC-WTC_000172328
Fax from KABACK detailing cost adjustments for HVAC controls and dampers at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.915
HVAC construction cost breakdown, 7 World Trade Center, June 1998 · Box 7DCASNYC-WTC_000172597
Itemized cost breakdown for HVAC work including controls, economizer coils, dampers, insulation, ductwork, and piping totaling $104,676, dated June 9, 1998.
1 shared topics · Same agency, volume and box · similarity 0.910
Memo regarding fuel line route and weld requirements, June 1999 · Box 7DCASNYC-WTC_000171313
Letter detailing required additional welds and pipe length for a new fuel line route at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.898
Letter regarding OEM Bulletin #1 sheetmetal work, Aug 24 1998 · Box 7DCASNYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
Same agency, volume and box · similarity 0.895
NYC-WTC_000171758 · Box 7DCAS1 shared topics · Same agency, volume and box · similarity 0.894
Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCASNYC-WTC_000172054
Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.
1 shared topics · Same agency, volume and box · similarity 0.891
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCASNYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.889
HVAC construction estimate, 7 World Trade Center, Sept 1990 · Box 7DCASNYC-WTC_000173169
Faxed estimate from HVAC contractor for construction work at 7 World Trade Center facility, dated September 1990.
Same agency, volume and box · similarity 0.888
Change order for recessed lighting, 7 WTC, Feb 1999 · Box 7DCASNYC-WTC_000171675
Letter from Kaback regarding change order for installing recessed lighting boxes at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.888
Kaback Enterprises HVAC quote for OEM, June 1998 · Box 7DCASNYC-WTC_000173125
Letter from Kaback Enterprises regarding HVAC louvers and dampers for the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.887