NYC 9/11 Public Portal Document
37-20 Twelfth Street, Long
Phone #718-784-6666 Pax #718-482-9016^^^^^^
INTERIOR SIDEWALK SHED, ENCLOSURE AND SCAFFOLD PROPOSAL
AMBASSADOR CONSTRUCTION Fax:
CUSTOMER NAME: J Phone: 2I2-922-JU2U
BILLING ADDRESS: 3i? Mad,sm Avenue 917.922-1733
Ne-«, York, I9Y 10017 CA’
JOBSITE ADDRESS 7 World Trade Center. NYC (Lobby)
♦ ♦JK**))!***********************
JOB CONTACT: Mazan Bararseh
★ lit************************************************** the following inside the firstfoor
We respectfully submit our proposal to furnish, erect, dismantle and remove
lobby:
1. Heavy Duty Sidewalk Shed: , . ceiling.
2^ linearfeet X 8' wide X14' high legs with wainscot from the a
Enclosure Around the Stair Tower with Plywood Construction Door and Hasp:
2. 8ft. X10ft. to the height ofthe shed deck and on two (2) sides to the height ofthe ceding.
Eipe and Clamp Scaffold: (In the Building Maintenance Service Room)
3. 86 X 6'9" X 15'6" deck height with existing ceiling to be removed before installation.
This quotation includes three (28 day) months or less usage.
S 18,900.00plus JOI3.51 tax
Cost of the Above
94J.00;^s 77.96 tax
Additional rental (every 28 days)
NOTES: ditrruantling on a Saturday.
J. Installation to be performed on a Saturday and^iday a^
2. Lighting by customer. \
Ji does not include
This quotation includes standard General Liability and Worker's Compensation tns^ maintenance; Permit rCft^
Engineering or drawings not spec^ above; Shoring ifrequired; up-
or any items not specifically mentioned above Relieffrom applicable State explicable on all past due imoi
furnishing ofauthorized evidence cftax exemption only. A 2'14 service charge per mant
Customer is responsible far all collection and legalfees.
page 1 of 2
NYC-WTC_000171308
OCR can misread numbers and units. Confirm readings against the page image before using them.