NYC 9/11 Public Portal Document
/
. 12/19/01® 9:00 AM
ITEM DESCRIPTION ACTION BY STATUS
GPS SYSTEM IS UP AND RUNNING ON ALL TRUCKS. SHOULD REMOVE PAPER SYSTEM WITHIN 2 WEEKS.
1 GPS ON TUG BOATS IS BEING TESTED. WILL BE ISSUING A POLICY FOR THE OPERATIONS PERSONNEL - DDC OPEN
TODAY 12/14. WORKING THROUGH SOME PROTOCOL ISSUES. ,
2 152 TIE-BACKS ARE INSTALLED. THERE IS TENSION ON 131 TIE-BACKS. REVISED BID DATE OF 12/27. BOVIS/AMEC OPEN
A SERIES OF MEETINGS HAVE BEEN OCCURRING WITH TULLY/TRANSIT AUTHORITY/RINALDI FOR THE
COORDINATION OF A PROGRAM FOR DEBRIS REMOVAL FROM THE 1/9 TUNNEL AT WEST BROADWAY.. NO
3 TULLY OPEN
WORK WILL BEGIN UNTIL BUILDING 5 IS COMPLETED, WHICH SHOULD BE AFTER 1/1/02. AWAITING SCOPE OF
WORK FROM T/A..:
DEBRIS REMOVAL AND SHORING OF BANKERS TRUST IS ON-GOING. OWNER IS MOBILIZED IN THE BUILDING
4 TULLY ON-GOING
FOR WINTERIZATION, VERIZON TO INSTALL ANALOG LINES FOR LZA - T/T ASAP. VERIZON IS TRYING TO ' ,
HAVE LINES UP BY 12/21. TULLY TO PROVIDE A MORE DEFINED SCOPE OF WORK ANDSCHEDULE
5 WORK ON THE AUXILIARY CHILLER ROOM IS COMPLETE. MOST OF THE ROOF IS OFF OF THE MAIN CHILLER DDC OPEN
ROOM. REVISION HAS BEEN ISSUED. THERE IS TO BE NO BURNING EXCEPT FOR TRE BOLTS.
30 WEST BROADWAY SCHEDULED TO BE COMPLETED BY DECEMBER 15, 2001. TURNER TO DEMOBILIZE SITE
6 DURING LAST 2 WEEKS OF DECEMBER. SCAFFOLD SHOULD BE DOWN BE THE END OF THE WEEK. NEED TO TURNER ONGOING
REVIEW HOW AND WHEN WE ARE GOING TO TURN BUILDING OVER.
CON-ED TO LOOK AT DAMAGE THAT ELECTRICAL VAULTS BY 30 WEST BROADWAY INCURRED AND REPAIR
7 CON-ED OPEN
THEM. ■ ■ " ' ■
8 NEW REPORT FOR SIDEWALK SHEDS & NETTING HAS BEEN ISSUED. WHEN SIGNING SIDEWALK BRIDGES 4 PRIMES OPEN
OVER, PLEASE CONTACT DAN ESCHENASY SO THAT PROPER PAPER WORK IS WRITTEN UP. f
TURNER IS COMPILING "AS-BUILT" SCHEDULE. TURNER ISSUED DRAFT ON FRIDAY 12/14.- COMMENTS ARE
9 TURNER/PRIMES OPEN
DUE BACK ON TUESDAY 12/18. ____ Z____________________________________ _
TULLY TO MEET WITH VERIZON AND CON ED TO DISCUSS WORK ON WEST STREET. SHOULD HAVE A MORE
10 TULLY OPEN
DEFINITE PLAN BY FRIDAY'S UTILITY MEETING.
PORT AUTHORITY HAS SUBMITTED A PLAN FOR REMOVAL OF VEHICLES IN BUILDING 6 TO THE FDNY. LERA
11 WILL BE MAPPING OUT LOCATIONS OF VEHICLES. VEHICLES WILL BE REMOVED ONCE DEMO OF BUILDING 6 PORT AUTHORITY OPEN
IS COMPLETED. . ' ••
-t