NYC 9/11 Public Portal Document
12/19/01@ 9:00 AM
THERE WILL BE A MODIFICATION IN THE SITE LOGISTICS PLAN AND THERE WILL ALSO BE A REVISION OF THE
12 EMERGENCY EVACUATION PLAN. SIRENS HAVE BEEN INSTALLED AND FINALIZED MODIFICATIONS TO BE FD/DDC OPEN
RELEASED ON FRIDAY 12/21.
13 DUST SUPPRESSION EFFORTS NEED TO. BE IMPROVED. 4 PRIMES OPEN
DEP REQUESTED FDNY WEST COMMAND BE RELOCATED TO GAIN ACCESS TO THE TIDE GATE. PROPOSED
14 LOCATION. IS THE TRUCK R^P. PAPD HAS NO PROBLEM WITH THIS LOCATION. AWAITING APPROVAL OF DDC OPEN
ALL UTILITY WORK TO BE PERFORMED WITH IN RED ZONE MUST HAVE DDC WRITTEN APPROVAL FROM
15 CON-ED/VERIZON OPEN
LOUIERUEDA
PARKING RESTRICTIONS HAVE GONE INTO AFFECT ON WEST STREET. OEM/DDC TO EVALUATE POSSIBLE \
16 OEM/DDO OPEN
PARKING SOLUTIONS. UPDATE NEXT WEEK. ' ’ /
DDC IS EVALUATING CONSOLIDATION PLAN FOR CM'S. BOVIS AND AMEC WILL BE TAKING THE LEAD.
17' DDC OPEN
SHOULD
- BE WORKED OUT BE THE END OF DECEMBER.
ANY SUB-GRADE ENTRIES INCLUDING UTILITY WORK HAVE TO BE REPORTED TO BOB ADAMS AND THE FIRE
18 iTgEPARTMENT. ' OPEN
5 ■ - K
ROAD PLATING NEEDS TO BE PINNED DOWN BEFORE THE SNOW STARTS. SIGNS SHOULD ALSO BE PLACED
19 ICON-ED/VERIZON OPEN
AROUND THEM. DDC TO REVIEW WHERE WORK IS STILL REQUIRED. ' ,
20 LIBERTY STREET PEDESTRIAN ACCESS PATH TO BE IMPLEMENTED BY TULLY. TULLY OPEN
DOT TRUCKS WILL BE USED. MORE DETAILS TO FOLLOW. OPEN
22 STEEL ON FLAT BEDS MUST BE TIED DOWN WHEN COMING OUT OF THE HOLE. PRIMES OPEN
23 EACH PRIME SHOULD LOOK AT THEIR SCAFFOLD STATION AND MAKE SURE THAT THEY ARE SECURE. PRIMES OPEN
TEST RUN OF BUSES DOWN CHURCH STREET HAS OCCURRED. PER MANABUS SERVICE MIGHT BEGIN
24 OEM/DDC OPEN
JMEXT WEDNESDAY, 12/26. A'ZtT l
25 WEEKS REPORTED NUMBER OF BARGES ARE PRESENTLY ADEQUATE.- ' WEEKS OPEN
26 WE ADVISE WORKERS THAT WE ARE STILL IN COMPLIANCE WITH OSHA. PRIMES OPEN
NYC-WTC_000154531