FDNY Incident Action Plan, Dec 21 2001

Machine-extracted title · confidence 95%

Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.

NYC-WTC_000154538–000154554

Folder label: “DEP OEM Reports to Commissioner

Page image
Scanned page image, NYC-WTC_000154550
OCR text

OCR status: ok · source: pdftotext

Z' J / z .12/19/01© 9:00 AM o • I STATUS o ITEM DESCRIPTION ACTION BY ■Q c o CT o GPS SYSTEM IS UP AND RUNNING ON ALL TRUCKS, SHOULD REMOVE PAPER SYSTEM WITHIN 2 WEEKS, o' "0 cn 1. GPS ON TUG BOATS IS BEING TESTED, WILL BE ISSUING A POLICY FOR THE OPERATIONS PERSONNEL DDC OPEN o tn o TODAY 12/14, WORKING THROUGH SOME PROTOCOL ISSUES. 9L O 2 152 TIE-BACKS ARE INSTALLED- THERE IS TENSION ON 131 TIE-BACKS. REVISED BID DATE OF 12/27. BOVIS/AMEC OPEN o o c 3 A SERIES OF MEETINGS HAVE BEEN OCCURRING WITH TULLY/TRANSIT AUTHORITY/RINALDI FOR THE o 3 COORDINATION OF A PROGRAM FOR DEBRIS REMOVAL FROM THE 1/9 TUNNEL AT WEST BROADWAY. NO 3 TULLY OPEN WORK WILL BEGIN UNTIL BUILDING 5 IS COMPLETED, WHICH SHOULD BE AFTER 1/1/02. AWAITING SCOPE OF WORK FROM T/A.

DEBRIS REMOVAL AND SHORING OF BANKERS TRUST IS ON-GOING. OWNER IS. MOBILIZED IN THE BUILDING 4 TULLY ON-GOING FOR WINTERIZATION. VERIZON TO INSTALL ANALOG LINES FOR LZA - T/T ASAP, VERIZON IS TRYING TO HAVE LINES UPBY 12/21. TULLY TO PROVIDE A MORE DEFINED SCOPE OF WORK AND SCHEDULE.

5 WORK ON THE AUXILIARY CHILLER ROOM IS COMPLETE. MOST OF THE ROOF IS OFF OF THE MAIN CHILLER DDC OPEN ROOM. REVISION HAS BEEN ISSUED. THERE IS TO BE NO BURNING EXCEPT FOR THE BOLTS.

30 WEST BROADWAY SCHEDULED TO BE COMPLETED BY DECEMBER 15, 2001. TURNER TO DEMOBILIZE SITE 6 DURING LAST 2 WEEKS OF DECEMBER. SCAFFOLD SHOULD BE DOWN BE THE END OF THE WEEK. NEED TO TURNER ONGOING REVIEW HOW AND WHEN WE ARE GOING TO TURN BUILDING OVER. *

CON-ED TO LOOK AT DAMAGE THAT ELECTRICAL VAULTS BY 30 WEST BROADWAY INCURRED AND REPAIR 7 CON-ED OPEN THEM. ' ■

8 NEW REPORT FOR SIDEWALK SHEDS & NETTING HAS BEEN ISSUED. WHEN SIGNING SIDEWALK BRIDGES 4 PRIMES OPEN OVER, PLEASE CONTACT DAN ESCHENASY SO THAT PROPER PAPER WORK IS WRITTEN UP.

TURNER IS COMPILING "AS-BUILT" SCHEDULE. TURNER ISSUED DRAFT ON FRIDAY 12/14. COMMENTS ARE 9 TURNER/PRIMES OPEN DUE BACK ON TUESDAY 12/18. '*21

TULLY TO MEET WITH VERIZON AND CON ED TO DISCUSS WORK ON WEST STREET. SHOULD HAVE A MORE TULLY OPEN- 10 DEFINITE PLAN BY FRIDAY'S UTILITY MEETING.____________________________________________ _

PORT AUTHORITY.HAS SUBMITTED A PLAN FOR REMOVAL OF VEHICLES IN BUILDING 6 TO THE FDNY. LERA 11 ■ WILL BE MAPPING OUT LOCATIONS OF VEHICLES. VEHICLES WILL BE REMOVED ONCE DEMO OF BUILDING 6 PORT AUTHORITY OPEN IS COMPLETED. • • ’

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154550Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000154518 · Box DEP Box 26

Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.

Cited alongside this record in an Ask answer

Compare copies and versions →