85 JOHN STREET; Block: 77 Lot: 1 BIN: 1001185 27-31 Gold Street — page 7
Asbestos Containing Material is defined by NYC and NYS his that which contains greater than 1-0 % Asbestos by Weight.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Asbestos Containing Material is defined by NYC and NYS his that which contains greater than 1-0 % Asbestos by Weight.
Summary January 2003 letter from Hudson River Management LLC to DEP regarding asbestos air testing and remediation results.
We are enclosing herewith a copy of asbestos ultrasonication test, which show an extremely high level of asbestos (1.3 million
Summary Record from the 55 Liberty Street folder with no readable text visible in the provided excerpt.
The presence of elevated levels of asbestos dust on surf$ees may result in result in increased exposure to asbestos.
Summary A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Document listing seven contractor companies authorized for asbestos removal and cleanup operations at the WTC site.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Summary Fragmented document page likely associated with World Trade Center environmental monitoring records from late 2001.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Cover page for a fax from NYU Environmental Services to Rockrose regarding the DEP request for environmental data.
The purpose of the investigation was to identify suspect dust and debris that may contain asbestos.
Summary Letter notifying building owner of visible debris found during DEP and USEPA exterior surveys at 120 Liberty Street.
ANG WHY HE MAD NOT BEEN TOLO OF THE POSITIVE ASBESTOS BESULTS.
Summary A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Document listing seven contractor companies authorized for asbestos removal and cleanup operations at the WTC site.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter I of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Record from the 55 Liberty Street folder with no readable text visible in the provided excerpt.
.~....9. x►asbestos sampling kncluderi it visual i; pectioo of the located at 55 Liberty Street in b{n1har3n. The survey asbestos.
Provided below is summary of the inspection and recommendations: .Asbestos Inspection Protocol Matthew Stock of GAC performed an asbestos study in accordance with all AHERA.
Summary Permit application for asbestos abatement contractor to clean interiors of a building at 125 [name].
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Scope specifications for 90-day interior cleanup contract with licensed asbestos abatement contractor covering 12 stories, penthouse, and basement.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Notice for mandatory pre-bid meeting regarding asbestos abatement scope of work at 125 Cedar Street (110 Liberty Street).
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos Control
Summary Notice for mandatory pre-bid meeting regarding asbestos abatement scope of work at 125 Cedar Street (110 Liberty Street).
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter I of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos Control
Summary Letter from DEP responding to an inquiry by enclosing scopes of work for environmental cleanup at 125 Cedar Street.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 1S, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos Control
Summary Formal request by a resident for the Department of Environmental Protection to perform cleaning and monitoring work at their apartment.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Resident request for DEP to perform cleaning and monitoring work at an apartment in Manhattan.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Permit application detailing background debris conditions and requirements for licensed contractors to clean interior surfaces.
The interior cleaning is to be accomplished by a licensed asbestos abatement contractor.