NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/No folder label
Document / 2 pages

Pre-bid Meeting Notice, 125 Cedar Street, Aug 2002

Machine-extracted title · confidence 90%

Notice for mandatory pre-bid meeting regarding asbestos abatement scope of work at 125 Cedar Street (110 Liberty Street).

NYC-WTC_000107375–000107376
Page image
Scanned page image, NYC-WTC_000107376
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

New York City Department of Environmental Protection Bureau of Environmental Compliance WTC Unoccupied Building Cleaning Program 125 Cedar Street Scope of Work Project #WTC_UNC

125 Cedar A MANDATORY PRE-BID meeting is scheduled for August 28, 2002 at 1:00 P.M. at through of the Street, Building Lobby, New York, N.Y. This conference will include a walk entire building.

Background

A follow-up visit to 125 Cedar Street, a.k.a. 110 Liberty Street, revealed debris and significant dust accumulation present on surfaces throughout the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor.

Purpose

A New York State Department of Labor (NYSDOL) licensed asbestos contractor with NYC DEP and NYSDOL certified workers shall perform the clean up of building interiors (12 stories, a penthouse, and a basen►ent-5,000 to, 6,000 square feet per floor). The entire building including common spaces, storage spaces, residential and commercial spaces (includes retail space on Liberty Street) shall be included in the clean up activities.

Contract Term

This contract shall be in force for 90 consecutive calendar days from the DEP commencement date. Contractors must be prepared to mobilize within 72 hours of the contract award.

Scone of Work

~i) Alt ork pertfornited shad uc in coutpliance With all apjlicabie, relevant, and appropriate regulations, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor, the New York State Department of Labor (NYSDOL), the New York State Department of Environmental Conservation, the New York City Department of Sanitation, the New York City Department of Health (NYC DOH), and the New York City Department of Environmental Protection (NYC DEP). (2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter I of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos Control Program prior to the start of work. USEPA and NYSDOL notification shall be submitted. (3) A third party air monitoring firm shall perform air sampling and provide project oversight. (4) The asbestos contractor shall provide sulticieht equipment and experienced personnel to complete work area preparation and cleaning activities of the building interiors within three

I of 6

NYC-WTC 000107376

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107376Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →