Pre-bid Meeting Notice, 125 Cedar Street, Aug 2002

Machine-extracted title · confidence 90%

Notice for mandatory pre-bid meeting regarding asbestos abatement scope of work at 125 Cedar Street (110 Liberty Street).

NYC-WTC_000107375–000107376
Page image
Scanned page image, NYC-WTC_000107375
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

New York City Department of Environmental Protection Bureau of Environmental Compliance WTC Unoccupied Building Cleaning Program 125 Cedar Street Scope of Work Project #WTC_UNC

28, 2002 at 1:00 P.M. at 125 Cedar A MANDATORY PRE-B1D meeting is scheduled for August include a walk through of the Street, Building Lobby, New York, N.Y. This conference will entire building.

Background revealed debris and significant A follow-up visit to 125 Cedar Street, a.k.a 110 Liberty Street, of the building. The interior dust accumulation present on surfaces throughout the interior cleaning is to be accomplished by a licensed asbestos abatement contractor.

Purpose contractor with NYC DEP A New York State Department of Labor (NYSDOL) licensed asbestos building interiors (12 stories, a and NYSDOL certified workers shall perform the clean up of building including penthouse, and a basement-5,000 to 6,000 square feet per floor). The entire retail space on common spaces, storage spaces, residential and commercial spaces (includes Liberty Street) shall be included in the clean up activities.

Contract Term DEP commencement This contract shall be in force for 90 consecutive calendar days from the contract award. date. Contractors must be prepared to mobilize within 72 hours of the

Scope of Work

All work perluruicd st►al ue iu cuu►pliance will► all applicable, ll) relevant, and appropriate Environmental regulations, including but not limited to those of the United States Protection Agency (USEPA), the United States Department of Labor, the New York State Department of Labor (NYSDOL), the New York State Department of Environmental Conservation, the New York City Department of Sanitation, the New York City Department of Health (NYC DOH), and the New York City Department of Environmental Protection (NYC DEP). (2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos Control Program prior to the start of work. USEPA and NYSDOL notification shall be submitted. provide project (3) A third party air monitoring firm shall perform air sampling and oversight. (4) The asbestos contractor shall , provide sufticic ut equipn►eut and experienced personnel to complete work area preparation and cleaning activities of the building interiors within three

I of 6

NYC-WTC 000107375

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107375Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →