NYC 9/11 Public Portal Document
New York City Department of Environmental Protection
Bureau of Environmental Compliance
WTC Unoccupied Building Cleaning Program
125 Cedar Street
Scope of Work
Project #WTC_UNC
28, 2002 at 1:00 P.M. at 125 Cedar
A MANDATORY PRE-B1D meeting is scheduled for August
include a walk through of the
Street, Building Lobby, New York, N.Y. This conference will
entire building.
Background
revealed debris and significant
A follow-up visit to 125 Cedar Street, a.k.a 110 Liberty Street,
of the building. The interior
dust accumulation present on surfaces throughout the interior
cleaning is to be accomplished by a licensed asbestos abatement contractor.
Purpose
contractor with NYC DEP
A New York State Department of Labor (NYSDOL) licensed asbestos
building interiors (12 stories, a
and NYSDOL certified workers shall perform the clean up of
building including
penthouse, and a basement-5,000 to 6,000 square feet per floor). The entire
retail space on
common spaces, storage spaces, residential and commercial spaces (includes
Liberty Street) shall be included in the clean up activities.
Contract Term
DEP commencement
This contract shall be in force for 90 consecutive calendar days from the
contract award.
date. Contractors must be prepared to mobilize within 72 hours of the
Scope of Work
All work perluruicd st►al ue iu cuu►pliance will► all applicable,
ll)
relevant, and appropriate
Environmental
regulations, including but not limited to those of the United States
Protection Agency (USEPA), the United States Department of Labor, the New York State
Department of Labor (NYSDOL), the New York State Department of Environmental
Conservation, the New York City Department of Sanitation, the New York City
Department of Health (NYC DOH), and the New York City Department of Environmental
Protection (NYC DEP).
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title
15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP
Asbestos Control Program prior to the start of work. USEPA and NYSDOL notification
shall be submitted.
provide project
(3) A third party air monitoring firm shall perform air sampling and
oversight.
(4) The asbestos contractor shall , provide sufticic ut equipn►eut and experienced
personnel to
complete work area preparation and cleaning activities of the building interiors within three
I of 6