NYC 9/11 Public Portal Document
New York City Deparunent of Environmental Protection
Bureau of Environmental Compliance
WTC Unoccupied Building Cleaning Program
125 Cedar Street
Scope of Work
Project #WTC UNC
A MANDATORY PRE-BID meeting is scheduled for August 28, 2002
at 1:00 P.M. at 125 Cedar
Street, Building Lobby, New York, N.Y. This conference will include a
walk through of the
entire building.
Background
A follow-up visit to 125 Cedar Street, a.k.a. 110 Liberty
Street, revealed debris and significant
dust accumulation present on surfaces throughout the interior
of the building. The interior
cleaning is to be accomplished by a licensed asbestos abatement
contractor.
Purpose
A New York State Department of Labor (NYSDOL)
licensed asbestos contractor with NYC DEP
and NYSDOL certified workers shall perform the clean up of
building interiors (12 stories, a
penthouse, and a basement-5,000 to 6,000 square feet per floor)
The entire building including
common spaces, storage spaces, residential and commercial
spaces (includes retail space on
Liberty Street) shall be included in the clean up activities.
Contract Term
This contract shall be in force for 90 consecutive
calendar days from the DEP commencement
date. Contractors must be prepared to mobilize within 72
hours of the contract award.
Scope of Work
(I) All work perloriiied snail De in Compliance with all applicable, relevant,
and appropriate
regulations, including but not limited to those of the
United States Environmental
Protection Agency (USEPA), the United States Department of
Labor, the New York State
Department of Labor (NYSDOL), the New York State
Department of Environmental
Conservation, the New York City Department of Sanitation,
the New York City
Department of Health (NYC DOH), and the New York City
Department of Environmental
Protection (NYC DEP).
(2) An ACP-7 form, asbestos project notification
form shall be submitted as required by Title
15, Chapter 1 of the Rules of the City of New York
(RCNY), directly to the NYC DEP
Asbestos Control Program prior to the start of work.
USEPA and NYSDOL notification
shall be submitted.
(3) A third party air monitoring fi rm shall
perform air sampling and provide project
oversight
(4) 'I he asbestos contractor shall provide sufticiel►t
equipment and experienced personnel to
complete work area preparation and cleaning activities of the
building interiors within three