4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗Document from 55 Liberty Street Folder
Machine-extracted title · confidence 100%Record from the 55 Liberty Street folder with no readable text visible in the provided excerpt.
NYC-WTC_000108307–000108313Folder label: “55 Liberty Street”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
FROM : GPAGAMGMUJGDA FAX NO. : 2127661309 i'Pay. 212 2002 08:45PM P3
55 Lbsny Apt 5A
Iatroduttiote .._._._._._._ . ._._._._._._. was conducted in his .apartment At the request of ._,.~.,~P'.',.~....9. x►asbestos sampling kncluderi it visual i; pectioo of the located at 55 Liberty Street in b{n1har3n. The survey asbestos. Edward Olmsted, CIH, sparm1ent ands pin rirface dust for the presence of CSP perfor d the survey on April 26.apartment 2002. The purpose of this survey was to that may have beer caned by the deters itu levels o: contamination in the is the most prevalent air collapse of the twit Towers of the Trade Center. Asbastoe z good sturogate for oouteainant poduced di.irig the collapse and as such it serves asthe building as a dust In a exposure to other sar eontaniinmts. 'these t?beasis settle done. THE FINDINGS OF and are liiwly to retasair► a peoble;n. unless properleanin8APARTMENT IS CONTAMINATED THE SURVEYS I DICATE TEAT THE WITH ASBESTOS. Levelc•of asbesxa ranged $om non-detectable to 2.5 million fibers per sque a centimeter. Os °ud 5etembex11,2001.The The World Trade Center (WTC) burned and eoUapsedaon wptember 1, 20 us►cs1 ti e bindings were oonstructed of cement, steel, glass, gyp -asbestos types) and and non ceilings, 8ptaysd-oa Insulation (asbesto'-containing $xturcr and paper products. contained wood, plastic and wesal funr tore, computers and(compressed, pulverized) 0? Most of these materials were either physically destroyed partieuatc anatter boned in the coliapee of the building. This process give rise to The dust settled particles. ranging from a very rote 4u t to larger sized, quicker settlingclearing effort to .remove the out onto roofs end other surfaces of nearby buildings. The c-TUM of the building dust from these buildings has varied and is dependent upuu Ilic owner. contractors. At the time of this The apannest waS cleaned twice by asbestos aa~etament windows and on the window survey there was visible dust on lac surfaces of the storm from the tide center ledges. The dust was consistent in eppearanoa with the debris are two sets of windows, co':kaper. In the livirf Trtnm, lad bc4 ow and bathroom there window am storm wiMtnwn, t tlerO. WSic i be outer wtadow 1st the vii zeal a.S the iear heavy lcveia of dust between bath sets of windows.
Methods according to the method Surface dust samples for the presence of asbestos were collectedMaterials (ASTM), This 5755-95 published by the American Society of Testing and centimeters 0.micron involves dxawini dust from a surface area of 100 square personal sampling pump mixed cellulose eater filter. The dust was collected using a Uansmissi`m eivctroa operated at 2 li:crs per innw. The filter is analyzed by overnight a danalyzed n:iccoscopy for asbeVAs tbrs. All of the samples were shipped Deperutie Health oy IATL. This lab is accredited through the New York State envtrorrmertal lab aecreciitatior. program (E )•
NYC-WTC 000108309
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
Filed elsewhere
NYC-WTC_000125801
Cover sheet for a fax transmission from DEP regarding the 105 Duane Street site file.
3 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000106116
Laboratory report detailing asbestos analysis using PLM, PCM, and TEM methods for bulk samples and air at 270 Broadway.
3 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
4 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
5 shared non-person entities · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123521
Cover page for a confidential asbestos laboratory report regarding samples from 25 Broadway dated February 20, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000105899
Scope of work document dated September 20, 2001, for emergency cleanup at 217 Broadway.
4 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115228
Invoice from Benjamin Kurzban & Son to the DEP for work completed at 213 Pearl Street on September 24, 2002.
2 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000131129
Letter from Vimar Realty responding to DEP requests for building contamination assessment at 83 Worth Street.
3 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104576
Fragmented document header or note related to environmental activities at 40 Fulton Street in March 2002.
2 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155920
Header page of a chain of custody document from the DEP Bureau of Air, Noise, and related services.
4 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111963
Billing statement from Fiber Control Inc. for work performed at the 12 Vesey Street job site.
2 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 55 Liberty Street · 2 pages · confidence 0.00 · verify page 2
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000108306
Record of asbestos inspection activities conducted at 55 Liberty Street by the Department of Environmental Protection.
Filed in the same folder
NYC-WTC_000125801
Cover sheet for a fax transmission from DEP regarding the 105 Duane Street site file.
Similar indexed content
NYC-WTC_000106116
Laboratory report detailing asbestos analysis using PLM, PCM, and TEM methods for bulk samples and air at 270 Broadway.
Similar indexed content
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Similar indexed content
NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
Similar indexed content