• Following the removal and replacement of ceiling tiles and cleaning of these areas, a
visual inspection shall be conducted by an independent third party project monitoring
firm and/or New York City School Construction (NYCSCA) representatives to verify that
all surfaces have been properly cleaned and are free of visible dust/debris.
• Prior to aggressive air sampling, to ensure air quality is not affected, thefollowing
shall be done: As a precaution, installfilter material over each supply air diffuser
prior to the activation of the mechanical ventilation system. The ventilation system
shall be run for approximately twenty four (24) hours. The system shall then be shut
off and all externalfdters shall be removed. Aggressive air monitoring shall then be
conducted throughout the space with the ventilation system running.
• Air sampling shall be performed on each floor as the cleaning work is completed in a
specific zone. Aggressive air sampling shall be conducted in the areas below the ceiling
and ambient air sampling shall be conducted in the air plenum (above ceiling) with the
ventilation system running. A total of 7 samples will be collected on each floor; 5
aggressive samples below ceiling and 2 ambient air samples above ceiling. ATC
Associates Inc. will perform the air sampling and analysis. All air sampling shall be
conducted in compliance with all applicable local, state and federal regulations
• Air samples shall be analyzed via Transmission Electron Microscopy (TEM)
methodology. Successful air clearance shall be achieved when all air samples collected
within the building are below 70 structures per millimeter squared (<70 str/mm’) - TEM
analysis.
Kiss Construction, Inc. has been retained by NYCSCA for this project and is scheduled to
commence work at 8;00 AM on February 5, 2002. Kiss Construction has estimated that this
work will be completed within four weeks.