NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Scope of work for HS Economics & Finance, Feb 2002

Machine-extracted title · confidence 28%

Scope of work document for Economics & Finance HS project following meeting.

NYC-WTC_000302312–000302313
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document Uil/UA-'ilUOi: PAA 412 3 53 fl306 ATC a 003/003

104 East 25** Street 10* Floor New York, New York 10010-2917 212.353.S2S0 Fax 212.353.8306 associates INC.

Mr. Bernard P. Orlan May 2, 2002 Page 2

• Following the cleaning of these areas, a visual inspection shall be conducted by an independent third party project monitoring firm and/or New York City School Construction (NYCSCA) representatives to verify that all surfaces have been properly cleaned and are free of \nsible dust/debris.

• Aggressive air sampling shall be performed on a floor-by-floor basts as the cleaning work progresses. Air sampling shall be conducted in compliance with all applicable local, state and federal regulations. Ln areas where the ceiling system has not been removed, that is, where sheetrock and/or plaster ceilings exist, aggressive air sampling shall be conducted both above and below the ceiling. ATC Associates Inc. will perform this air monitoring.

• Air samples shall be analyzed via Transmission Electron Microscopy fTEM) methodology- Successful air clearance shall be achieved when all air samples collected within the building are below 70 structures per millimeter squared (<70 stt/mm^) - TEM analysrs.

• Following successful air clearance sampling on each floor, the Contractor will install new ceiling tiles and/or install access hatches where applicable on that floor. The area below these ceilings will be recleaned following the installation of the new materials

Kiss Consh-uction. Inc. has been retained by NYCSCA to perform this work. Thus project is scheduled to commence at 8:00 AM on February 3. 2002. IMss Construction has estimated that this w ork Will be completed within four weeks.

If you liave any questions or comments rcEarding the scope of work, please do not hesitate to contact us at your earliest convenience.

Sincerely,

ATC ASSOCIATES INC.

'Mark /M'es-'n Senior Project Manager

MT/dc

Cc: -A. Leir-pert- SCA E. Duke - SCA C. Procter - UTT E. Tele-naquc - EMTEQUE

CITY_21MC166_6O9193215

NYC-WTC_000302313

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302313Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000453767

Scope of work for plenum cleaning at Stuyvesant High School, meeting attendees listed.

Similar indexed content

Compare copies and versions →