NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

Scope of Work, HS for Economics & Finance

Machine-extracted title · confidence 31%

Revised scope of work details for HS Economics & Finance following review.

NYC-WTC_000429804–000429806
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

104 East 25"' Street IO'" Floor New York, New York 10010-2917 212.353.8280 Fax 212.353.8306 ASSOCIATES INC.

Mr. Bernard P. Orlan February 5, 2002 Page 2

• Following the cleaning of these areas, a visual inspection shall be conducted by an independent third party project monitoring firm and/or New York City School Construction (NYCSCA) representatives to verify that all surfaces have been properly cleaned and are free of visible dust/debris.

• Prior to aggressive air safopling, to ensure air quality is not ajfected, the following shall be done: As a precaution, installfilter material over each supply air diffuser prior to the activation of the mechanical ventilation system. The ventilation system shall he run for approximately twenty four (24) hours. The system shall then be shut off and all externalfZiers shall he removed. Aggressive air monitoring shall then be conducted throughout the space with the ventilation system running.

• Aggressive air sampling shall be performed on a floor-by-floor basis as the cleaning work is completed. Air sampling shall be conducted in compliance with all applicable local, state and federal regulations. In areas where the ceiling system has not been removed, that is, where sheetrock and/or plaster ceilings exist, aggressive air sampling shall be conducted both above and below the ceiling. ATC Associates Inc. will perform this air monitoring.

• Air samples shall be analyzed via Transmission Electron Microscopy (TEM) methodology. Successful air clearance shall be achieved when all air samples collected within the building are below 70 structures per millimeter squared (<70 str/mm^) - TEM analysis.

• Following successful air clearance sampling on each floor, the Contractor will install new ceiling tiles and/or install access hatches where applicable on that floor. With the ventilation system running, the area below the ceilings will be recleanedfollowing the installation of new materials.

Kiss Construction, Inc. has been retained by NYCSCA for this project and is scheduled to commence work at 8:00 Abf on February 5, 2002. Kiss Construction has estimated that this work will be completed within four weeks.

CITY_21MC100_010223709

NYC-WTC_000429805

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000429805Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →