NYC-WTC_000302312
Scope of work document for Economics & Finance HS project following meeting.
5 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗Final scope of work agreed for plenum cleaning at HS Economics & Finance.
NYC-WTC_000302340–000302342OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
104 East 25* Street 10* Floor ▲ 1 New York, New York 10010-2917 212.353.8280 Fax 212.353.8306 ASSOCIATES INC.
Mr. Bernard P. Orlan February 5, 2002 Page 2
• Following the removal and replacement of ceiling tiles and cleaning of these areas, a visual inspection shall be conducted by an independent third party project monitoring firm and/or New York City School Construction (NYCSCA) representatives to verify that all surfaces have been properly cleaned and are free of visible dust/debri.s.
• Prior to aggressive air sampling, to ensure air quality is not affected, the following shall be done: As a precaution, installfilter material over each supply air diffuser prior to the activation of the mechanical ventilation system. The ventilation system shall be run for approximately twenty four (24) hours. The system shall then be shut off and all external filters shall be removed. Aggressive air monitoring shall then be conducted throughout the space with the ventilation system running.
• Air sampling shall be performed on each floor as the cleaning work is completed in a specific zone. Aggressive air sampling shall be conducted in the areas below the ceiling and ambient air sampling shall be conducted in the air plenum (above ceiling) with the ventilation system running. total of 7 samples will be collected on each floor; 5 aggressive samples below ceiling and 2 ambient air samples above ceiling. ATC Associates Inc. will perform the air sampling and analysis. All air sampling shall be conducted in compliance with all applicable local, state and federal regulations
• Air samples shall be analyzed \ la fransmission Electron Microscopy (TEM) methodologc’. Successful air clearance shall be achieved when all air sample.s collected within the building are below 70 structures per millimeter squared (<70 str/mm') - TEM analysis.
Kiss Construction. Inc. has been retained by NYCSCA for this project and is scheduled to commence work al 8:00 AM on February 5, 2002. Kiss Construction has estimated that this work will be completed within four weeks.
CITY_21MC100_009193288
NYC-WTC_000302341
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000302312
Scope of work document for Economics & Finance HS project following meeting.
5 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432248
Final scope of work for replacing ceiling tiles and plenum cleaning at HS Economics & Finance, Feb 2002.
7 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232344
Letter finalizing the scope of work for ceiling tile removal and replacement at the High School of Economics and Finance.
7 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429804
Revised scope of work details for HS Economics & Finance following review.
5 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232566
Letter from ATC Associates regarding revisions to the scope of work for asbestos sampling at the High School for Economics and Finance.
4 shared non-person entities · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232569
Letter from ATC Associates confirming the agreed scope of work for asbestos sampling at the High School for Economics and Finance.
6 shared non-person entities · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453580
BOE/plenum cleaning scope of work for Economics & Finance HS at 110 [name] Ave, 2/7/02.
6 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453767
Scope of work for plenum cleaning at Stuyvesant High School, meeting attendees listed.
6 shared non-person entities · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453877
Final scope of work for plenum cleaning at High School of Economics and Finance.
6 shared non-person entities · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419035
Plan for surface cleaning verification and aggressive air sampling by NYCSCA/ATC during school cleanup.
2 shared non-person entities · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429802
Scope of work for cleaning ceilings and plenums at High School for Economics and Finance, 100 Trinity Place, January 2002.
4 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000436980
Scope of work for cleaning ceiling plenums and locations at HS Economics & Finance building.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000232344
Letter finalizing the scope of work for ceiling tile removal and replacement at the High School of Economics and Finance.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432248
Final scope of work for replacing ceiling tiles and plenum cleaning at HS Economics & Finance, Feb 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429804
Revised scope of work details for HS Economics & Finance following review.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232566
Letter from ATC Associates regarding revisions to the scope of work for asbestos sampling at the High School for Economics and Finance.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302312
Scope of work document for Economics & Finance HS project following meeting.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232569
Letter from ATC Associates confirming the agreed scope of work for asbestos sampling at the High School for Economics and Finance.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000432248
Final scope of work for replacing ceiling tiles and plenum cleaning at HS Economics & Finance, Feb 2002.
Similar indexed content
NYC-WTC_000232344
Letter finalizing the scope of work for ceiling tile removal and replacement at the High School of Economics and Finance.
Similar indexed content
NYC-WTC_000429804
Revised scope of work details for HS Economics & Finance following review.
Similar indexed content
NYC-WTC_000232566
Letter from ATC Associates regarding revisions to the scope of work for asbestos sampling at the High School for Economics and Finance.
Similar indexed content
NYC-WTC_000232569
Letter from ATC Associates confirming the agreed scope of work for asbestos sampling at the High School for Economics and Finance.
Similar indexed content