Final scope of work agreed for plenum cleaning at HS Economics & Finance.

NYC-WTC_000302340–000302342
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(Swrc 104 £35125“- Street 10“- Floor New York, New York 10010-2917 212.353.8280 Fax 212.353.8306 ASSOCIATES INC.

February 7, 2002

Mr. Bernard P. Orlan New York City Board of Education 28-11 Queens Plaza North Long Island City, NY 11101

Re: Scope of Work R2 HS for Economics & Finance (M833)

Dear Mr. Orlan:

A meeting was held today (02/07,02) at I lO Livingston Street attended by representatives from the BOE, SCA, UFT, M833 P.A Consultant and ATC to review and finalize the scope of work for the plenum cleaning at the High School of Economics and Finance. Below please find the final scope of work as agreed to by the attendees.

SCOPE OF WORK

• Contractor will remove and replace with NEW al! existing ceiling tiles from suspended ceiling systems on the first through tenth floors. These tiles will be disposed of by the Contractor as conventional waste. Following the removal of the ceiling tiles and prior to the installation of new tiles, the Contractor will perform cleaning above the ceilings and within the plenums to remove any visible debris and remove/repair any damaged/Ioose duct insulation.

• The elevators shafts/pits and air return shaft shall also be cleaned. Cleaning shall be performed utilizing wet wipmg/llEPA vacuuming techniques in order to minimize the migration of dust within the building.

• In areas where ceiling plaster and/or sheetrock ceilings exist, the Contractor shall cut access hatches in various location.s w ithin each space so as to allow' for access above these ceilings for cleaning purposes. Contractor will install new access hatches where applicable on that floor.

• All other surfaces within the building including but not limited to lights, diffusers, floors, walls, desks, chairs, window sills, etc. shall be protected during this work and shall be rendered free of any dtist and/or debris following the cleaning and prior to air sampling.

CITY_21MC1OO_OO9193287

NYC-WTC_000302340

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302340Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →