NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Scope of work for M833 plenum cleaning

Machine-extracted title · confidence 55%

Final scope of work for plenum cleaning at High School of Economics and Finance.

NYC-WTC_000453877–000453878
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

104 East 25“* Street 10“* Floor New York, New York 10010-2917 212.353.8280 Fax 212.353.8306 ASSOCIATESINC.

February 8, 2002

Mr. Bernard P. Orlan New York City Board of Education 28-11 Queens Plaza North Long Island City, NY 11101

Re: Scope of Work R3 (2/8/02 10:19AM) HS for Economics & Finance (M833)

Dear Mr. Orlan:

A meeting was held on February 07, 2002 at 110 Livingston Street attended by representatives from the BOE, SCA, UFT, M833 PA Consultant and ATC to review and finalize the scope of work for the plenum cleaning at the High School of Economics and Finance. Below please find the final scope of work as agreed to by the attendees.

SCOPE OF WORK

• Contractor will remove and replace with NEW all existing ceiling tiles from suspended ceiling systems on the first through tenth floors. These tiles will be disposed of by the Contractor as conventional waste.

• The elevators shafts/pits and air return shaft shall also be cleaned. Cleaning shall be performed utilizing wet wiping/HEPA vacuuming techniques in order to minimize the migration of dust within the building.

• All other surfaces within the building including but not limited to lights, diffusers, floors, walls, desks, chairs, window sills, etc. shall be protected during this work and shall be rendered free of any dust and/or debris following the cleaning and prior to air sampling.

• Following the removal and replacement of ceiling tiles and cleaning of these areas, a visual inspection shall be conducted by an independent third party project monitoring firm and/or New York City School Construction (NYCSCA) representatives to verify that all surfaces have been properly cleaned and are free of visible dust/debris.

• Prior to aggressive air sampling, to ensure air quality is not a/fected, the following shall be done: As a precaution, install filter material over each supply air diffuser prior to the activation of the mechanical ventilation system. The ventilation system shall be run for approximately twenty four (24) hours. The system shall then be shut off and all external filters shall be removed. Aggressive air monitoring shall then be conducted throughout the space with the ventilation system running.

Mr. Bernard P. Orlan

CITY_21MC100_001841149 NYC-WTC_000453877

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000453877Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000453767

Scope of work for plenum cleaning at Stuyvesant High School, meeting attendees listed.

Similar indexed content

Compare copies and versions →