NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

Scope of Work, HS for Economics & Finance

Machine-extracted title · confidence 31%

Revised scope of work details for HS Economics & Finance following review.

NYC-WTC_000429804–000429806
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

104 East 25“’Street IO* Floor AI New York, New York 10010-2917 212.353.8280 Fax 212.353.8306 ASSOCIATES INC.

February 5, 2002

Mr. Bernard P. Orlan New York City Board of Education 28-11 Queens Plaza North Long Island City, NY 11101

Re: Scope of Work (Revised) ns for Economics »& Finance (M833)

Dear Mr. Orlan:

Following a review of the Scope of Work, dated February 4, 2002 for the above referenced location, UFT representative,s Ms. Chris Proctor and Ms. Ellie Engler have requested the following revisions to the scope of work. The revisions to the original scope of work are highlighted and italicized and appear on page 2 of this document, all other items within the scope of work will remain as originally stated:

, SCOPE OF WORK

• The Contractor shall perform a thorough cleaning above suspended ceiling systems and plenums as well as within the elevator pits within the building. Cleaning shall be performed utilizing wet wiping/HEPA vacuuming techniques in order to minimize the migration of dust within the building.

• Contractor will remo. c existing ceiling tiles from suspended ceiling systems on the first through tenth floors. These tiles will be disposed of by the Contractor as conventional waste. Following the removal of the ceiling tiles, the Contractor will perform the cleaning above the ceilings and within the plenums as described above. Cleaning of the plenum shall include all components and systems within the plenum. This work will be performed on a floor- by- lloor basis, starting on the tenth floor and working downwai'd.

• In areas where ceiling plaster and/or sheetrock ceilings exist, the Contractor shall cut access hatches in various locations within each space so as to allow for access above these ceilings for cleaning purposes.

• Cleaning shall be performed until all surfaces are free of visible dust and/or debris. All other surfaces within the building including but not limited to lights, diffusers, floors, walls, desks, chairs, window sills, etc. shall be protected during this work and shall be rendered free of any dust and/or debris following the cleaning and prior to air sampling.

CITY_21MC100_010223708

NYC-WTC_000429804

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000429804Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →