NYC 9/11 Public Portal Document

02/04/2002 18:35 FAX 212 353 8306 ATC 1^1003/003

104 East 25* Sheet 10* Floor New York, New York 10010-2917 212.353.8280 Fax 212.353.8306 ASSOCIATES INC.

Mr. Bernard P. Orlan May 2, 2002 Page 2

• Following the cleaning of these areas, a visual inspection shall be conducted by an independent third party project monitoring firm and/or New York City School Construction (NYCSCA) representatives to verify that all .surfaces have been properly cleaned and are free of visible dust/debris.

• Aggressive air sampling shall be performed on a floor-by-floor basis as the cleaning work progresses. Air sampling shall be conducted in compliance with all applicable local, slate and federal regulations. In areas where the ceiling system has nol been removed, that is, where sheetrock and/or plaster ceilings exist, aggressive air sampling shall be conducted both above and below the ceiling. ATC Associates Inc. will perform this air monitoring.

• Air samples shall be analyzed via Tiunsmission Electron Microscopy (TEM) methodology. Successful air clearance shall be achieved when all air samples collected within the building are below 70 stnicrures per millimeter squared f<70 str/mm^) - TEM analysis.

• Following successful air clearance sampling on each floor, the Contractor will install new ceiling tiles and/or install access hatches where applicable on that floor. The area below these ceilings will be recleaned following the installation of the new materials.

Kiss Construction, Inc. has been retained by NY'CSCa to perform this work. This project is scheduled to commer.ee ai ?:00 /AM on February 5, 2002. Kiss Construction has estimated that this work will be completed wnhin four weeks.

If you have any questions or comments regarding the scope of work, please do not hesitate to contact us at your earliest convenience.

Sincerely.

ATC ASSOCIATES INC.

.Mark Tarjesen Senior Project Manager

MT/dc

Cc: A. Lempert - SCA E. Duke - SCA C. Proctor - CTT F. Telemaque - EMTEQUE

CITY_21MC1OO_OO311O967

NYC-WTC_000232570

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000232570Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →