NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Scope of work for HS Economics & Finance, Feb 2002

Machine-extracted title · confidence 28%

Scope of work document for Economics & Finance HS project following meeting.

NYC-WTC_000302312–000302313
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

02/04/2002 18:36 FAI 212 333 8306 ATC ®002/003

104 East 25“^ Street 10* Floor 1A1 New York. Nc^v York 10010-2917 212.353.8280 Fax 212.353.8306 associates INC.

May 4, 2002

Mr. Bernard P. Orlan New York City Board of Education 28-11 Queens Plaza North Long Island City, NY 11101

Re: Scope of Work HS for Economics & Finance (M833)

Dear Mr. Orlan;

As per our meeting on February 4, 2002 at the 1-Iigh School for Economics and Finance, located at 100 Trinity Place, New York, NY. and based on discussions with UFT representatives as well as the PTA’s consultant (EMTEQUE), tire following scope of work has been formulated and agreed on by all parties concerned:

SCOPE OF WORK

• The Contractor shall perform a thorough cleaning above suspended ceiling systems and plenums as well a.s within tlie elevator pits within the building. Cleaning shall be performed utilizing wet wiping/HEPA vacuuming techniques in order to minimize the migration of dust within the building.

• Contractor will remove existing ceiling hies from suspended ceiling systems on the first through tenth floors. These tiles will be disposed of by tire Contractor as conventional waste. Following the removal of the ceiling tiles, the Contractor will perform the cleaning above the ceilings and within the plenums as described above. Cleaning of the plenum shall include al! components and systems within the plenum. This work will be perfomred on a floor-by- floor basis, starting on the tenth floor and working downward.

• In areas where ceiling plaster and-'or sheetrock cc-ilirrgs exist, the Conti-actor shall cut access hatches in various locations within each space so as to allow for access above these ceilings for cleaning purposes.

• Cleaning shall be performed until all surfaces are ft-ee of visible dust and/or debns. All other surfaces within the building including but not limited to lights, diffusers, floors, walls, desks, chairs, window silk. etc. shall be protected during this work and shall be rendered free of any dust and/or debris following the cleaning and prior to air sampling.

CITY_21MC100_009193214

NYC-WTC_000302312

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302312Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000453767

Scope of work for plenum cleaning at Stuyvesant High School, meeting attendees listed.

Similar indexed content

Compare copies and versions →