ALLOWANCE FOR INCIDENTAL ASBESTOS ABATEMENT
1.05B WORK AREA CLEARANCE LEVELS
"Clearance Air Monitoring" shall mean the employment of aggressive sampling
techniques with a volume of air collected to determine the airborne
concentration of residual fibers and shall be performed as the final abatement
activity.
A. The clearance criteria sill be applied to each homogeneous work area
independently.
B. For PCM analysis involved in alteration or renovation projects, the clearance air
monitoring shall be considered satisfactory When every sample is less than or
equal to 0.01 f/cc or less than the ambient concentration, whichever is larger.
C. For PCM analysis involved in pre-demolition abatement activities, the clearance
air monitoring shall be considered satisfactory when every sample is less than or
equal to 0.05 f/cc or less than the ambient concentration, whichever is larger.
D. For TEM analysis, the clearance monitoring will be considered satisfactory if
conducted in accordance with 40 CFR Part 763, Subpart E, Appendix A- Section
IV - Mandatory Interpretation of Transmission Electron Microscopy Results to
Determine Completion of Response Actions.
1^ PAYMENT REQUEST
A. Request for payment shall be submitted to the Commissioner, Department of
Design and Construction not more often than every 30 days that this Contract is in
force.
B. Each payment request shall include copies of all Work Order Letters completed in
that month. Each Work Order Letter shall be listed separately.
C. The following information shall be included for each Work Order Letter:
1. Description of work performed.
2. Linear footage and pipe sizes involved.
3. Square footage for boiler & breaching insulation removed.
4. Square footage of non pipe and boiler areas removed, patched, enclosed,
sealed, or painted.
5. Square footage of encapsulation, sealing, patching, painting involved.
6. Total cost associated with compliance with Work Order Letter.
7. Architectural, Electrical, HVAC, Plumbing, etc. work incidental to the
CAPITAL PROJECT NUMBER XXXXX 01020-97
100% CONTRACT DOCUMENTS REV. 0: DATE