ALLOWANCE FOR INCIDENTAL ASBESTOS ABATEMENT
D. Building location/address, including Block and Lot numbers;
E. Work schedule including the starting and completion dates;
F. Abatement methods to be employed;
G. Procedures for removal of asbestos-containing material;
H. Name, title and authority of governmental representative sponsoring project.
1.5 WORK INCLUDED IN UNIT PRICE
An allowance as identified in the Bid booklet has been established for any
additional work in areas that contain asbestos that is exposed during
construction. From this allowance, the Contractor will be paid a basic unit
price of $12.00 per square feet of asbestos containing, material which will be
required to be removed and replaced with asbestos-free materials.
Unit price shall include all costs necessary to do the work of this Contract,
including but not limited to: labor, materials, equipment, utilities, disposal,
insurance, overhead and profit.
1.05A TESTING LABORATORY SERVICES
A. "Air Sampling" shall mean the process of measuring the fiber content of a known
volume of air collected during a specific period of time. The procedure utilized
for asbestos follows the NIOSH Standard Analytical Method 7400 or the
provisional transmission electron microscopy methods developed by the USEPA
and/or National Institute of Standard and Technology which are utilized for lower
detectability and specific fiber identification.
B. Air monitoring of Contractor's personal will be performed in conformance with
OSHA requirements, (All costs associated with this work are deemed included in
the unit price.)
C. Qualifications of Testing Laboratory:
The Contractor shall employ an Industrial Hygienist or Laboratory to conduct air
testing as described in paragraph 1.5 A (above). They shall be selected from the
latest list of laboratories compiled by National Institute of Standards and
Technology (NIST SRM 1876) as having participated in the NIST Proficiency
Analytical Testing Program and been identified thereon as "Proficient" (P) in the
analysis of samples for the presence of Asbestos.
Note: Work area air testing and analysis before, during and upon
completion of work (clearance testing) will be performed by a
laboratory under separate Contract with the City. The City will pay
all associated costs directly to this third party laboratory.
CAPITAL PROJECT NUMBER XXXXX 01020-96
100% CONTRACT DOCUMENTS REV. 0: DATE